Live Feed in ServiceNow connects record discussions with comments, work notes, and automatic update messages. Users can follow record feeds and contribute to the conversation, while administrators configure access and notification behavior. Live Feed is discontinued, requires Core UI, and becomes disabled when Next Experience is enabled; check your instance and release before planning changes.
Understand how Live Feed connects records and comments
A record feed is a Live Feed group associated with a record, such as an incident or change. Document feeds use the same association. This connection gives a discussion a specific working context: readers can relate an update to the task being handled instead of interpreting it as a general company announcement.
Users can post through the feed interface, and those messages are maintained as comments or work notes on the associated record when it has those journal fields. That condition matters when choosing a table. Before testing a conversation, inspect the record form and establish which journal fields the table actually provides.
The connection also works through a journal integration business rule. The rule named Live feed integration runs on Journal Entry [sys_journal_field] and writes journal comments to Live Feed when a group exists for the record. Treat the group association as a troubleshooting checkpoint: a saved comment alone does not establish that its record has a feed group.
For a first test, use a record with a known feed association and recognizable sample text. Add a message through its feed, inspect the journal entry on the record, and then check a comment entered from the record side. Record what appears and who can see it. Do not assume comments and work notes have interchangeable visibility.
Choose how records gain feeds and members
Two properties govern different parts of the experience. The property glide.ui.show_live-feed_activity controls automatic enablement for records and is disabled by default. With it enabled, viewing a record creates a record feed automatically and makes the viewer a member. That can change membership during ordinary record browsing.
The separate property glide.live-feed.auto_join_document_group enables automatic membership when someone visits the associated document and clicks Show Live Feed. Document groups add members through other routes as well. The group is created when someone follows or shows the record, the user who creates a record on a document-feed table becomes its administrator, any user who later modifies that record joins the group, and the group adds users as they view the record. Test each route on its own. Choose the behavior your users expect before expanding access across tables.
- Identify a table and a test record, then note whether a feed group already exists.
- Inspect the two property values and record the starting membership state.
- Visit the record as a representative user and check whether viewing it creates a feed or changes membership.
- Test Show Live Feed separately, then compare membership before and after that action.
- Repeat with another authorized user so the result is not based entirely on an administrator session.
These are validation steps rather than a recommendation to enable automatic feeds everywhere. Decide whether users should join through record viewing or through a feed interaction, then test that decision against the tables in scope. Avoid changing both properties during the same diagnostic test because the result becomes harder to explain.
Add entry points on the intended table
Adding Live Feed UI actions to a table requires ui_action_admin or admin. Navigate to System Definition > UI Actions and open an existing Live Feed action, such as the Follow on Live Feed list UI action. Change Table to the destination table, then right-click the header and select Insert to create a copy. Repeat for the Live Feed UI actions needed on that table.
Use Insert for the copied action rather than treating the original as a disposable template. Afterward, inspect the copy’s Table value and test the resulting entry point on an actual record. A configuration record associated with the wrong table can make an otherwise sound feed setup appear incomplete.
Adding the form-header entry point requires admin. Enter sys_properties.list in the Application Navigator, open glide.live_feed.task_header_button, set Value to both, and click Update. Its default value is collaboration; both allows the property to support Collaboration and Live Feed together.
Next, open System Definition > Tables and select the table. Add the Live feed field to the form layout if it is missing, select the Live feed check box, and click Update. Alternatively, add live_feed=true to Attributes in the table’s dictionary entry. The Live Feed button then appears in the form header’s overflow menu.
Test the entry point and the conversation separately. A visible button establishes that the navigation configuration is present; a round-trip comment test establishes whether the record association and journal behavior meet the team’s needs. Keep those acceptance checks distinct when recording the result.
For help planning this work, see ServiceNow implementation.
Separate automatic updates from written comments
Live Feed table notifications generate messages when a record is inserted or updated on a specified task table and the notification conditions are satisfied. The destination can be a selected group or the company feed. Users with the live_feed_admin or chat_admin role can set up these notifications, and the Live Feed plugin must be active for them to work.
The Live Feed events business rule on Task [task] runs on insert, update, and delete. It triggers an event associated with the Live Feed Update Script action, which processes Live Table Notifications. This describes the event path; it does not mean that each changed field becomes a message in a record conversation.
Test a notification using a change that meets its conditions and a second change that does not. Inspect the destination feed in both cases. Then test a journal comment independently. This distinguishes an automatic notification problem from a journal integration problem before someone starts modifying business rules.
Agree which updates deserve attention. A proposed operating rule might reserve automatic messages for a defined state change and leave explanations to written comments. Test the rule with the people handling the records so that an automated event and a person’s explanation remain understandable together.
Live Feed is a discussion tool on records, not the threat intelligence feed feature. If that feature is what you need, see threat intelligence feeds and sharing. A discussion around a record and an intelligence feed serve different purposes, so define the expected outcome before choosing configuration work.
Validate access using the people who will read the conversation
Administrators and users with live_feed_admin can configure Live Feed security and, by default, view all Live Feed tables. Group membership management is narrower: the LiveFeed Membership Changes business rule permits the group administrator and users with live_feed_admin to manage membership. Do not turn either statement into a blanket role requirement for posting.
Live Feed includes rules controlling message access, group visibility, and membership. A successful administrator test therefore needs a second check from an intended reader. Verify the record, feed, member list, and messages with representative accounts before deciding that the discussion is ready for wider use.
Domain separation adds another visibility boundary. Parent-domain users can view content in their domain and child domains below it. Child-domain users cannot view parent-domain content or sibling-domain content. A parent user’s reply within a child thread takes the child domain’s visibility. Check these relationships with actual test accounts.
For a document-generated team, changing the document’s domain also changes the domain of its related Live Feed records. Cover that case if records move between domains during their lifecycle. Check both the discussion’s destination and the users who should retain access after the move.
If your review concerns security analysts’ working interface, continue with Security Incident Response Workspace. For discussions attached to compliance work, see compliance case management. Limit the test to the records you selected for it, and check each one with a representative account.
Questions about organizing Live Feed conversations
Can users find messages by topic?
Hashtags categorize messages for searching and filtering. Agree on a small vocabulary before a team starts tagging discussions, so alternate spellings do not fragment the topic. With domain separation, hashtag availability and visibility follow domain boundaries.
Can a user receive an email when new messages appear?
Users can subscribe to email notifications for new messages. In a domain-separated instance, subscriptions to users and teams are limited to the subscriber’s own domain. Build that boundary into your notification expectations across a parent and child organization.
Can people navigate a feed with the keyboard?
Users taking advantage of platform accessibility options can tab through Live Feed. Test keyboard navigation with the intended users, especially the path from the record form into the discussion.
What happens if someone is added to the same group twice?
The LiveFeed Single Group Membership business rule prevents duplicate membership for a user within one group. When investigating unexpected membership results, inspect the existing membership before attempting another addition.
Can someone join a private visible group automatically?
The LiveFeed Join Group Check business rule prevents automatic joining of private visible groups. Visibility in a group list should therefore not be treated as evidence that the person has joined or can manage the group’s membership.