OBLYTECH Logo
OBLYTECH Logo

Manage asset put away for stockrooms

To manage asset put away for stockrooms, enable warehouse tasks on the stockroom, review its open Asset put away tasks, and record the destination aisle and space before closing the work. In Hardware Asset Workspace, this connects received hardware with a specific shelf location and gives the stockroom team a task to finish.

Manage asset put away for stockrooms from receiving to shelving

A received asset can be inside the correct stockroom without having a usable shelf location. Put away tracks that remaining movement from the receiving bay to its designated aisle and space. The task makes the shelving work visible rather than leaving the next person to search the receiving area.

Separate the receipt check from the placement check in your operating routine. First establish which asset arrived and which stockroom holds it. Then establish where it belongs within that stockroom. If the receipt itself needs attention, work through hardware receiving and stockroom management before treating a shelf assignment as evidence that the receipt was correct.

Use one asset as a walkthrough before changing the routine for a whole receiving team. Identify the item, its current stockroom, the intended shelf, and the person responsible for placement. These are operating checks: a task record does not establish that someone physically carried the hardware to the recorded destination.

Enable warehouse tasks on the intended stockroom

The role required to enable put away for a stockroom is inventory_user. The setting belongs to the selected stockroom, so check the record you are changing rather than assuming that a setting in another warehouse covers this one.

  1. Navigate to Workspaces > Hardware Asset Workspace > Inventory.
  2. Select the All stockrooms tab and open the intended stockroom.
  3. On the Stockroom Details form, select Warehouse tasks required.
  4. Select Save.

This setting enables the stockroom to perform warehouse tasks, including Asset pick and Asset put away tasks. Review the operational consequences with the people responsible for both movements. Put away should fit the receiving routine, while picking belongs to the process for taking hardware from its stored position.

Check the feature and navigation against your installed application version and release before rollout. The older release guidance identifies Hardware Asset Management version 13.0.0 onwards for Asset put away. Keep that compatibility check in the setup review, alongside the stockroom setting and access permissions.

For the surrounding configuration decisions, use Hardware Asset Management setup and configuration. For help planning this work, see ServiceNow implementation.

Check task generation before creating work manually

With the required business rules met and warehouse tasks enabled, creation of a hardware asset in Hardware Asset Workspace without an Aisle-space value generates an Asset put away task. Updating the Stockroom field on the Hardware Asset Details form is another task creation trigger. These events give the team a starting point for tracking placement.

Before making a manual task, inspect the existing work for that asset and stockroom. This is an operational safeguard against asking two people to shelve the same item. A missing task should lead to a check of the asset and stockroom conditions before someone assumes that automatic creation failed.

A stockroom that has not been enabled for warehouse tasks will not produce these tasks, even when every new asset lacks an aisle and space value. If a stockroom appears to have no put away work at all, check that setting before concluding that the receiving team is up to date.

The task also works as a record check. A received asset without an aisle and space value is still missing its location in the stockroom, and the open task is the visible sign of that gap until the value is entered.

From Inventory, open the Open put away tasks card in the Inventory overview section. To narrow the work to one stockroom, select that stockroom from All Stockrooms, then use Open put away tasks in its Open stockroom tasks section. Open a task through its Number link to inspect the record behind the list entry.

Keep the physical handoff clear. For example, agree whether receiving staff leave an item in a marked bay for the assigned stockroom worker or perform the shelving themselves. That local decision helps explain who should act on the task; it should not be confused with an automatic assignment rule.

Create a manual task for eligible in stock hardware

Manual creation requires inventory_user. The asset must be In stock and must not already have an Aisle and Space value. Check those two facts before spending time on the task form.

  1. In Inventory, select Open put away tasks from the Inventory overview section, or open the same card within the selected stockroom.
  2. Select New to open the Create New Asset put away task form.
  3. Select the Asset and check the populated Stockroom.
  4. Set the Assignment group and Assigned to values for the person responsible.
  5. Record the Due date and Notes needed to coordinate the movement.
  6. Select Save to create the task, or use Close task when the required Drop off location is provided and the placement work is ready to close.

The form supplies Number automatically. A new task has State set to Open, and Task name is populated as Put away. Stockroom is populated when the asset is selected. Assigned to identifies the person from the assignment group who has primary responsibility, while Due date records when closure is expected.

The Notes field fills itself from the task’s Short description and Description values, so the record already carries a summary of the movement. Add to Notes only what the person doing the placement needs beyond that summary, such as a reason the planned shelf could not be used.

Use the assignment fields to express ownership clearly. A group can identify the responsible team, but the person carrying out the movement still needs to know that the item is waiting.

Record the destination and close the shelving task

Closing an Asset put away task requires inventory_user. Open the task through its Number link and select the Drop off location value on the Put away task form. This field identifies the aisle and space in the stockroom and is required for closure.

Match the destination to the actual placement before selecting Close task. If you need to preserve changes while remaining on the page, select Save. Treat saving and closing as different decisions: one preserves the record, while the other finishes the task.

If the intended shelf is occupied, agree an available destination with the stockroom owner, then record where the item was actually placed rather than the planned location.

After closure, the task no longer appears in the Open put away tasks list. The Activity tab records closure, and the work notes identify the user who closed it. Review those details when the shelf position and the team’s understanding of completion do not agree.

Teams working on the floor can also use the ServiceNow Agent application. A worker scans the in stock assets in the inventory and places each one in the scanned drop-off location. Once the asset is in that location within the stockroom, the task can be closed from the application. In practice the mobile route suits placement done at the shelf, while the desktop Put away form suits reviewing a record after the fact.

For multiple open tasks assigned to you, Bulk close opens the Select Assets dialog box. Select the tasks and use Close Task, supplying a drop-off location for the movement. Because the associated assets move to that destination, group tasks by their actual placement rather than selecting unrelated items to clear the list faster.

Once the receiving area is clear, place the remaining checks within the broader stockroom operations routine. A shift handoff should distinguish hardware still waiting for placement from work that has been closed and checked.

Investigate closure states and location mismatches

A disappearing open task deserves a record check if nobody recalls closing it. Filling the asset’s Aisle and Space value closes its associated put away task as Closed Complete. Changing the asset’s State from In stock to another value without entering Aisle and Space closes the task as Closed Incomplete.

Those outcomes need different follow-up. For Closed Complete, compare the recorded location with the shelf. For Closed Incomplete, inspect the asset’s state change and establish what happened to the item. Do not treat a reduced open-task count as proof that the receiving bay was cleared correctly.

When the expected action is unavailable, check the action’s inventory_user requirement, the selected stockroom’s warehouse setting, and the asset’s eligibility. For a broader investigation, use the Hardware Asset Management troubleshooting guide. Keep the task number and the observed asset values together so another operator can reproduce the problem.