OBLYTECH Logo
OBLYTECH Logo

Import Fortify scan results into Vulnerability Response

The Fortify vulnerability integration imports scan findings into Application Vulnerability Response after the application is installed, credentials are tested, and its integration records are configured. Prepare CWE data first, choose the scan types and triage behavior, then run the application list, scan summary, and vulnerable item integrations in sequence.

Prepare the instance before the Fortify vulnerability integration

Start with the dependencies that determine whether imported findings will have the context they need. Vulnerability Response must be installed and activated. The Fortify integration application needs its own installation and activation, and it is available through a separate subscription. Check purchased subscriptions under Subscription Management > Subscriptions before planning the production installation.

The CWE integration should be running before you install and configure Fortify. NVD data can enrich the result, but it is not an installation prerequisite. This distinction matters when a team postpones application scanning because a separate vulnerability data import is unfinished. See NVD and CWE imports and third-party libraries for that preparation work.

Have an App-Sec Manager lead preparation, configuration, imports, and verification. The System Administrator [admin] installs the application and assigns users to the App-Sec Manager group. Keep those responsibilities explicit in the change plan so installation access does not become the assumed permission for subsequent security operations.

Estimate the application vulnerable item volume before the first import and assess instance sizing against it. An undersized instance can produce long load times. Record the expected scope, who will review the resulting records, and the point at which the team will consider the first import complete. These are acceptance criteria to agree before execution.

Install the application and prepare credentials

For a production instance, locate Vulnerability Response Integration with Fortify in the ServiceNow Store. Open its application tile and review Other Requirements and Dependencies. Use Request App, provide the Now Support credentials, and select Get. Complete Instance Name and Reason for the Instance, use Validate Instance, then select Request.

After receiving the installation instructions, go to System Applications > Applications, select the application, and use Install. Treat installation as one checkpoint rather than the signal to start importing. The Fortify connection still needs configuration before the integration runs.

Prepare the API Key, API Secret, and API root URL from the Fortify on Demand account. To generate the secret, an App-Sec Manager preparing the integration signs in to the Fortify portal and navigates to All > Administration > Setting > API, adds ServiceNow as an application, and selects New Secret. Record the secret securely for configuration.

Keep the instance, Fortify account, and intended scan scope together in the handover record. A successful installation does not establish that credentials point to the intended source. The broader ServiceNow Vulnerability Response overview explains where application findings fit within vulnerability management.

Configure the connection, scan scope, and triage ownership

As App-Sec Manager, open Fortify Vulnerability Integration > FoD Configuration. Populate API root URL, API key, and API secret. Use Include DAST to bring in findings from scans of application behavior and Include SAST to bring in findings from code scanning. Choose these settings against the agreed scope before testing the connection.

Next decide where exception and false-positive decisions should happen. Starting with Vulnerability Response v20.0, Manage exceptions in ServiceNow and Manage false positives in ServiceNow are separate options and are activated by default. Check the controls on your instance and release; earlier versions use the combined Manage your application vulnerability triaging in ServiceNow instance option.

  • With Manage exceptions in ServiceNow activated, source states that would normally map to Deferred instead map to Open. An exception can then be requested from the AVI record.
  • With Manage false positives in ServiceNow activated, False Positive and Potential False Positive source states that would normally map to Closed instead map to Open for ServiceNow triage.
  • Deactivating either option preserves the corresponding imported source-state mapping to Target states and Target reason states, without the associated ServiceNow triage workflow.

Use Save and Test Credentials after completing the form. Do not treat Open records as evidence of incorrect state mapping without first checking the triage choice. An imported source disposition and the state used for ServiceNow review can intentionally differ. Capture that decision so the team assessing findings knows which system owns the next action.

For help planning this work, see ServiceNow implementation.

Activate the import sequence before running findings

Open All > Fortify Vulnerability Integration > Integrations as App-Sec Manager. The connector has three integration records with different jobs. Review them individually; having one active record does not establish that the complete findings pipeline is enabled.

  1. Fortify on Demand Application List Integration: brings in application scanner information and metadata. It is active by default and scheduled daily at 00:00:00.
  2. Fortify on Demand Scan Summary Integration: retrieves scan records. It is inactive by default and, when activated, follows the application list integration.
  3. Fortify on Demand Application Vulnerable Item Integration: retrieves scan results and enriches third-party vulnerability data. It is inactive by default and, when activated, follows scan summary.

Review Active, Run, Time, Source integration, Source instance, and Next integration for the selected record. Next integration defines the following step in the chain. Verify the order against the three records above before starting a manual run. Application context, scan records, and findings serve different purposes; skipping a stage makes the resulting import harder to assess.

Each integration record has a run-as user whose default is VR.System. Leave that value unchanged. Do not replace the technical run-as identity with the manager who performs configuration. Leave Integration script, Integration factory script, and Report processor strategy unchanged unless the team has the expertise to evaluate a change to them.

Run the initial import and assess the result

An App-Sec Manager can select an integration and use Execute Now. Execute Now runs an integration manually. A manual full import is a separate procedure from the scheduled delta runs, so record why a full import is needed before starting one. Run the application vulnerability integrations in sequence for complete retrieval rather than starting with the findings record alone.

After the initial import, subsequent runs retrieve delta data. Scheduled jobs run daily and chain the activated integrations in order. This makes the first import a different acceptance exercise from an ordinary ongoing run: establish that application information, scans, and vulnerable items have arrived before relying on later synchronization.

Review a sample whose application, scan type, and source disposition are known. Compare what was expected with the scan-scope and triage settings selected earlier. If DAST findings were outside the selected scope, for example, their absence should lead back to that decision before anyone changes integration scripts. Treat this comparison as an operating check rather than a new product setting.

Starting with Fortify integration v2.3, the Application Vulnerable Item integration run records provide processing-time details and reports. Use those details when investigating a slow run, alongside the expected import volume. For a review of an established deployment, see Vulnerability Response health checks.

Decide whether closed findings should create records

Closed scanner records do not create new application vulnerable items by default, although existing items continue to receive updates. Agree whether closed history belongs in the first import before interpreting record totals. A count comparison without source-state context can make an intentional exclusion look like lost data.

If the integration is installed and running, an App-Sec Manager can type sys_properties.list into the Filter navigator, search Name for sn_vul.create_closed, and change Value to True. Save with the green check mark icon. The next Fortify import can then create AVITs for records in the Closed state. Document why this setting is needed before changing the import scope.

Decisions that shape a Fortify rollout

A development instance does not need production entitlements

The production entitlement request does not apply to applications downloaded to non-production or development instances. Those instances can proceed through Store application activation. Keep that distinction in the rollout plan when testing before production.

Exception and false-positive handling can have separate owners

The separate options available from Vulnerability Response v20.0 let the team choose each behavior independently. Agree the ownership of each decision category rather than assuming both must follow the same triage policy.

Domain separation belongs in the initial plan

If domain-separated imports are required, include that configuration in initial planning. Resolve the domain import requirement before accepting the production result so verification reflects the intended environment.

Connector setup does not complete Application Vulnerability Response setup

No. Initial installation also requires Application Vulnerability Response configuration. Include that work in the deployment acceptance plan so a working Fortify import is assessed within the application workflow it will support.