To set up Slack chat for major security incidents, install the Slack connector and Slack spoke. Connect a designated workspace, validate the provider, and activate channel templates. Promoted incidents then have their own collaboration channels. Use the MSIM Workspace Collaboration tab to review chat activity and check the available activity filters.
Prepare the Slack chat connector for major security incidents
Start with a designated Slack environment and an agreed plan for incident collaboration. Decide which groups need separate conversations and which people should take part. Decide how responders will know which incident a channel belongs to. These decisions shape the template rather than becoming corrections during an active response.
Two prerequisites serve different needs. Install Slack Chat Connector for Security Incident Management, using the plugin ID sn_slack_connector, to support tracking of Slack collaboration activity. Install Slack spoke to establish the connection with Slack. Check the connector application’s compatibility with your instance and release before configuring it; the steps below follow Brazil behavior.
Give the setup work to the right administrator. Activating the provider needs sn_msi.workspace_admin for write access and sn_msi.chat_collab_provider for read access. Creating channel templates needs sn_msi.workspace_admin. Keep these role needs in the implementation checklist. Then, if a setup form is blocked, you check access first before you change connection details.
Agree how Slack collaboration fits the wider major security incident management process. Channel creation, who joins, and conversation review should support the response plan of the incident owner.
Connect and validate the Slack provider
Open All > Major Security Incident Management > Chat Channel > Chat Provider Configuration, then select Slack. Use Download Slack manifest to get slack_manifest.json. This file supplies the Slack application configuration; keep the downloaded configuration associated with the intended ServiceNow instance and Slack workspace.
- In Slack application management, select Create New App and choose From an app manifest. Choose the workspace, select Next, and use the JSON tab to paste the manifest contents.
- Continue with Next, review the application summary, and select Create. From Basic Information, select Install to Workspace and approve the requested access with Allow.
- Finish the signing-secret setup through All > Slack Configurations in ServiceNow and the App Credentials section of the app. This ServiceNow action needs sn_msi.workspace_admin.
- In ServiceNow, open All > Flow Designer, then Connections > Slack > View Details > Configure.
- Fill in Connection Name, Connection URL, Credential Name, OAuth Name, OAuth Client ID, OAuth Client Secret, and OAuth Redirect URL for the app and instance you are connecting.
- Select Configure and Get OAuth Token, then Allow when Slack asks for access to the workspace.
Use the token expiration shown on the connection to plan later checks. Record who owns the setup, but keep secrets out of incident notes and chat messages. People who maintain the connection after setup should be able to identify it.
Return to Chat Provider Configuration and select the Active check box on the Slack provider record. Select Validate Connection and look for the message that the provider connection was validated successfully. Right-click the record and select Save. In your test record, treat activation and a successful validation as two separate checks.
In Slack application management, inspect Features > OAuth & Permissions to verify the scopes. Under Features > Event Subscriptions, select Retry for Request URL, confirm the verified message, and select Save. A connection test and an event subscription check prove different parts of the integration. Record both results.
Create recognizable channels and assign participants
With sn_msi.workspace_admin, go to All > Major Security Incident Management > Chat Channel > Channel Templates. Open Slack channel configuration and select Active. In Team Name, set the incident number and code name pattern that responders should know. Right-click the configuration and select Save before you create the channel details.
The shared naming setup applies across major security incident records. The default prefix includes the incident number, and field references use the format {field_name}. Keep a value that tells incidents apart. A generic name such as legal may name a function. The incident prefix tells responders which response the conversation belongs to.
In Chat Channel Configuration, select New. Review these fields together:
- Chat Team Configuration: select the parent configuration you want, such as Slack channel configuration.
- Channel Name: enter the channel identifier. Names allow lowercase letters, numbers, hyphens, and underscores, with a maximum of 50 characters.
- Channel Description: give a distinct description that explains what the channel is for.
- Channel Users: use Unlock Channel Users, choose the users from the lookup list, then use Lock Channel Users.
- Channel User Groups: use Unlock Channel User Groups, select the groups you need, then use Lock Channel User Groups.
Select Submit to save the channel configuration. Spaces in channel names become hyphens, and special characters are removed on their own. Compare the final name with the name responders expect to search for in Slack. Punctuation that looked useful in a planning document may vanish from the real identifier.
Review membership against the purpose of the conversation before you test promotion. For example, a legal talk and a technical containment talk may need different people. Use the broader major incident security and access design to frame that review. Then verify who is really in the Slack channel.
For help with this work, see ServiceNow implementation.
Test promotion and manage incident channels
Try the template with a controlled test incident. Slack channels are created from the configuration when a security incident is promoted to a major security incident. Check the incident-specific naming, the channel hierarchy you expect, and the assigned users and groups in both Slack and the workspace. A saved template alone does not show that the promoted incident has the right collaboration setup.
Channel management in the workspace ties to a role on your instance. Confirm which role your instance grants for the Chat Channel Manager before the test. The role list and the collaboration steps do not name the same role. Select Collaboration, then Chat Channel Manager > Create New Channel. Enter Channel Name and Description, choose Members, and select Create. Verify that the new channel appears in Slack and shows in MSIM.
To change an incident channel, select it in the Chat Channel Manager list. Adjust Channel name, Members, or Group Members as needed, then select Save. Deleting a selected channel uses Delete Channel. Before a deletion test, agree which test conversation can be removed. Also agree what evidence needs to remain available for the review.
Keep a short acceptance record. Note the incident used, its promotion result, the channels you saw, and the participants you checked. This makes a later gap easier to find. Keep template expectations apart from changes made to the channels of one incident. Then the next test has a clear baseline.
Review chat activity and check filtering
Slack conversations appear on the Collaboration tab of the Major Security Incident Management workspace. The task of viewing Slack chat activity needs sn_msi.workspace_admin. Open the incident and compare a known test conversation in Slack with the collaboration activity shown for that incident.
Choose a test message you can spot and record its channel before you review the stream. This gives the reviewer something specific to find. Confirm that the activity belongs to the right incident. Do not accept unrelated collaboration entries as evidence of success.
The workspace has a filter at the top right of Activity Stream to find collaboration activity. Check the Slack activity choices on your instance, apply a relevant filter, and compare the result with the broader stream. Verify that you can still find the known conversation. Do not treat a filtered view as the full incident history.
Say a channel exists but you cannot find its conversation. Look into these in order: the incident link, the activity view you picked, provider validation, event subscription verification, and participant access. Record the first check that differs from the successful test. This ties troubleshooting to a symptom you can see, not to repeated setup changes.
Run the collaboration test within the wider security operations incident response workflow. Responders then practice finding decisions as well as sending messages.
Questions about connector upkeep and response readiness
Does a connector update deserve an access regression check?
Yes. After a connector update, include typical access and collaboration checks in acceptance testing. Do not assume that a successful install shows that responder access is unchanged.
What belongs in the incident closure rehearsal?
Include conversation retrieval and channel archiving in the rehearsal. These are part of the incident closure scope of the connector. Agree who checks the captured conversation and who verifies the channel result before you sign off the rehearsal.
Should the first exercise use sensitive investigation material?
Use made-up content for the first exercise. A test exchange you can spot can show channel links and activity visibility. It does not expose investigation details while you are still checking membership and access.
How should teams divide responsibility for continuing checks?
Name an owner for the ServiceNow provider setup, an owner for the Slack app, and a response lead for channel participation. Assign the acceptance evidence to those responsibilities so an expired token, a changed application, or an unexpected participant has a clear review path.