OBLYTECH Logo
OBLYTECH Logo

Request a bulk exception in the Vulnerability Manager Workspace

Use the Bulk Edit button in the Vulnerability Manager Workspace to request an exception for several vulnerable items or configuration test results in one action. Select the records or filter the list, complete the deferral fields in the Bulk Edit modal, and submit. ServiceNow creates one remediation task holding the selected records and routes it for approval.

Preparing the selection before you open Bulk Edit

Before you tick any check box, look at the state and CI of each record on the list, so you can see which records fall outside the eligibility rules covered below.

Write down the change you want, the reason category, and the end date before you open the modal. That way the deferral fields can be completed in one pass.

Roles needed for each record type

The role depends on the type of record in your selection, so confirm it before you open a list. Host vulnerable items need sn_vul.vulnerability_analyst or sn_vul.vulnerability_admin. Application vulnerable items need sn_vul.app_sec_manager. Container vulnerable items need sn_vul_container.vulnerability_analyst or sn_vul_container.vulnerability_admin. Configuration test results need sn_vulc.admin.

A person who handles host items may still need a different role to request exceptions for application items, so plan the work by list rather than assuming one role covers the whole workspace.

If the request concerns a policy rather than a vulnerability, read the ServiceNow policy exception guide before you start.

Opening the Bulk Edit modal from a list

The procedure is the same for each record type. What changes is the list you open.

  1. Navigate to Workspaces > Vulnerability Manager Workspace.
  2. On the List page, open the Active or All list for Host Vulnerable items, Container Vulnerable items, Application Vulnerable items, or Configuration Test Results.
  3. Select the check box next to each item you want to include, or apply filters to define the set.
  4. Select the Bulk Edit button.

For a wider view of the list pages and the controls around them, read the Vulnerability Manager Workspace guide.

Before you continue, confirm that the Record selection field matches how you made the selection. That choice decides which records the request touches.

Choosing which records the request updates

The Record selection field controls the scope of the request. Its choices are:

  • Only Selected Items updates the records you ticked with their check boxes.
  • All records that match filter updates the filtered records on the list.
  • Remediation Task updates the records in a remediation task. Pick that task in the Remediation task field.
  • Vulnerability Entry updates the records tied to one vulnerability. Pick a CVE or TPE in the Vulnerability Entry field. This option appears for host, application, and container vulnerable items.
  • Configuration test updates the test results for one test. Pick the test in the Configuration test field. This option appears for configuration test results only.

Check boxes suit a short list of records you have reviewed one at a time. Filters suit a larger set that shares an attribute, and you should confirm the count of matching records before you submit.

Filling in the deferral fields

Set the State field to Deferred to request an exception for the selected records. The modal then shows four fields.

  • Reason accepts Awaiting Maintenance Window, Fix Unavailable, Risk Accepted, Mitigating Control in Place, or Other.
  • Short description is a brief note on why the records are being deferred. It flows into the Description field of the remediation task. The field also appears for the Closed-False positive state.
  • Until is the date through which the records stay deferred.
  • Additional information flows into the Additional Information field in the Overview tab of the remediation task. If the deferral is approved, it also appears as deferral notes on the vulnerable item and the remediation task.

Using the Mitigating Control in Place reason

When you choose Mitigating Control in Place, the modal checks risk-change eligibility across the selected records. With a mixed selection, the modal shows how many items are eligible. If none are eligible, the modal states that risk change is restricted, and the request cannot proceed for those items. Read that count before you submit, and decide how to handle the ineligible items first.

Enter work notes that describe the change, then click Edit.

Submitting the request and checking the outcome

If the questionnaire is enabled for exception requests in the Exception Management form, the Take Questionnaire modal opens after you click Edit. Answer the questions and click Submit. If the modal does not open when you expect it, check that setting.

On submission, a remediation task is created with the records you selected. The request is submitted for approval, the state of the records changes to In Review, and the approver receives an email notification.

To check the outcome, go to Exceptions > All in the Vulnerability Manager Workspace and open the state change approval record (VCA#). Read the Approval state column:

  • Approved: the state of the remediation task changes to Deferred, with the Reason as its sub-state. The state and reason roll down to the records.
  • Rejected: the state of the remediation task and its records does not change.

The Activity stream of a record or remediation task shows the entire workflow of the request.

Remediation owners raise the same kinds of exception requests from the IT Remediation Workspace. Use that workspace when one record is in scope and this bulk path when the change covers a group of records.

Records a bulk request leaves unchanged

A selected record can stay unchanged even when it appears in your selection and your role is correct. These rules explain the skipped records:

  • Records with an invalid CI, or a decommissioned CI, are not updated.
  • Only records in the Open, Under Investigation, or Awaiting Implementation state are updated.
  • Application vulnerable items from scanners with Manage exceptions in ServiceNow set to false are not updated.

Mixed application vulnerable item selections

When your application vulnerable items come from several scanners, the items linked to scanners with Manage exceptions in ServiceNow set to false are skipped, and the rest are updated. If all the selected application items come from scanners with that setting at false, the Defer option does not appear in the State field, so plan the request around that before you open the modal.

Bulk edit covers host vulnerable items from Vulnerability Response v21.0, application and container vulnerable items from v22.0, and test results from v23.0. Field names and availability can vary by release, so check the Bulk Edit modal on your own instance and release before you train requesters.

Checks to run before you submit

  1. Confirm your role for each record type in the selection.
  2. Match the Record selection choice to how you picked the records, and check the count of matching records.
  3. Check that each CI is valid and not decommissioned, and that each record is in an eligible state.
  4. Choose one Reason for the request. If it is Mitigating Control in Place, read the eligibility count first.
  5. Set an Until date that matches the period the deferral needs, and write Additional information the approver can act on without opening the record.
  6. Answer the questionnaire before you click Submit.

One reason per request makes the approval record easier to read, because all the records in the task share the same deferral context.

For help planning this work, see ServiceNow implementation.

Questions about deferral requests and selections

How does a deferral request differ from a false positive request?

Once approved, a deferral moves the records to Deferred, with a reason and an end date set in the Until field. A false positive is a separate request type that the workspace also supports, with its own procedure, so choose the path that matches the outcome you need before you select records.

When does the Remediation Task option make more sense?

It suits records that already sit in one remediation task. Check the task in the Remediation task field before you submit, because that field decides which set the request changes.

Is bulk editing the right path for recurring container findings?

If the same container findings return after each scan, a separate automation approach may reduce repeat requests. See the guide on automating exception requests for container vulnerable items for that route.

Why might one set of records need more than one bulk request?

The procedure starts from one list at a time, so records from host, application, container, and configuration lists need separate runs. Plan the runs by record type before you select anything.

Can I raise a new bulk request after a rejection?

A rejection leaves the remediation task and its records unchanged, so a new bulk request can include them if they still meet the eligibility rules.