Run structured workflows for crisis events

Structured workflows for crisis events run in the Business Continuity Workspace. A program manager links the disruption to affected assets, applicable business continuity plans and recovery strategies, then assigns event tasks to response teams. Each task moves through defined states while the event runs, and the event itself is approved in the BCM UIB Workspace.

Running structured workflows for crisis events, step by step

The workflow typically runs in this order: report the event, attach the assets and plans, build and assign the tasks, manage their states, then request and approve the event. Later stages build on the event record, so a thin entry at the start leaves them working from less information. Work the stages in sequence on a live event, even when several people handle them at the same time.

Business Continuity Management (BCM) program managers create crisis events to coordinate response efforts. The Business Continuity Workspace is also called the BCM Configurable Workspace, and both names refer to the same place in the application. Approval sits in a different place, the BCM UIB Workspace, so expect users to move between the two.

Reporting the crisis event

A crisis event is any significant disruption that threatens business operations. Report one in the Business Continuity Workspace, where you create the crisis record and document the initial actions. For the full reporting steps, read the guide to running a crisis event in ServiceNow BCM.

If the disruption first surfaces on the home page, you can report it from the Home page view instead. Write the initial actions as they happen. The record is the reference point for the rest of the workflow, and a clear first entry saves follow-up questions when new people join the response.

On some releases the start form also lets you classify severity, set priorities and assign response teams. Check the form on your instance before you write instructions for program managers, because the fields you see depend on the release.

Linking assets and plans to the event

Once the event exists, track the impacted assets and add the related plan. You can monitor the assets and plans from the BCM UIB Workspace. Assets can then be recovered in the planning stage, so the plan you attach here is the starting point for that recovery work.

Attach the plan before you build the task list. In practice, a task list built first often repeats steps the plan already describes, and the duplicates are hard to spot once the team is working. For the wider BCM setup behind these records, see how BCM is set up in ServiceNow.

Assigning event tasks to response teams

Add a task to the crisis event in the BCM UIB Workspace. Each task describes one action the response needs, and its state shows whether that action is still active.

Automated tasks from the business continuity plan do not need to be typed in again. You can import them into an actual event, which reduces the time the response spends on manual entry.

Assign each task to a user, a group or both. Record actual start and actual end dates as the work happens, not afterward from memory. Those fields, along with the state, are the ones bulk edits can change, so keep them accurate as you go. If your responders are also alerted through the crisis map, see how Everbridge notifications work with the crisis map.

Bulk editing from the Event tasks related list

Starting with version 6.1.x of the Business Continuity Management application, users with editing access to the event record can make bulk edits to tasks from the Event tasks related list. This helps when one manager has to reassign or re-date several tasks at once. In the recovery tasks list, five fields can be changed together:

  • State
  • Assigned to
  • Actual start
  • Actual end
  • Assigned group

After the event is initiated, the state of an event task can be changed from either the list view or the form view. If a transition is not allowed, the instance shows an error stating that the update is invalid. Check each task’s current state before a batch change, because a disallowed transition returns that error.

Moving an event task through its states

An event task is in one of seven states: Pending, Open, Work In Progress, Closed Complete, Closed Incomplete, Closed Skipped or Closed Failed. The state governs what users can do with the task next, so change it when the work has actually changed, not when you expect it to change.

Three transition rules are worth planning around:

  • An event task can only be opened from the Closed Complete state.
  • Once a task is Open, users of the event task can edit it further.
  • A task in Open can move to Closed Skipped.

Each UI action is available from specific states:

  • Trigger applies to Pending tasks once the event has started.
  • Skip task is available from Pending, Open and Work In Progress.
  • The Work in progress action moves a task from Open.
  • Closed Complete, Closed Incomplete and Closed Failed are reached from Work In Progress.
  • Re-trigger as a manual task is available from a closed task.
  • Re-trigger automation is available from Work In Progress or a closed task, and applies to automated tasks.

Reopening a task closed by mistake

A task that was closed in error can be reopened so the team can make the required edits. Reopening is limited to users with access to the event. Recovery task members can change the status of an event task, but they cannot reopen it.

Add an activity note that explains why the task was reopened, so the next person reading the record can follow the change.

Updating tasks as a recovery task member

Recovery task members usually update the status of their own tasks. They do not have access to the event page or workspace, so they open My Recovery Tasks in the instance and use the UI action there to change the status. When a recovery member marks a task Closed Complete, all fields on the form lock. The member can still add activity notes, but users with access to the event task are the ones who can edit the fields afterward.

Who can perform each action in the workflow

Access depends on which record or task an action touches. Grant each group access to the action it needs rather than giving one group access to the whole area.

  • Creating a crisis event: BCM program managers.
  • Bulk editing tasks from the Event tasks related list: users with editing access to the event record.
  • Reopening an event task: users with access to the event.
  • Changing task status from My Recovery Tasks: recovery task members.
  • Editing fields on a task that a recovery member closed as Closed Complete: users with access to the event task.

Checks before you close out the response

Before you treat the event as finished, walk the task list and confirm that each state reflects what happened on the ground. Run the checks in this order:

  1. Review tasks still in Open or Work In Progress, and decide whether each one is closed complete, incomplete, skipped or failed.
  2. Confirm the Assigned to and Assigned group values, because bulk edits can change both.
  3. Check the actual start and actual end dates on completed work.
  4. Review tasks that a recovery member closed as Closed Complete.
  5. Request an approval for the crisis event, then approve it in the BCM UIB Workspace.

On a long response, repeat the first check at intervals rather than leaving the whole review to the end. A short pass during the response catches stale states before they reach the approval step. For help planning this work, see ServiceNow implementation.

Common mistakes when running the workflow

In practice, teams run into the same few problems. Treat these as patterns to watch for rather than fixed outcomes on your instance.

  • Leaving a task in Open after the work is finished, so the team lead sees active work that is no longer active.
  • Reopening a task without a note, which makes the task history hard to follow.
  • Bulk-changing tasks without checking their current states, then missing the error that flags a disallowed transition.
  • Expecting recovery members to edit fields after they close a task, when the form is locked to them.

Questions about event tasks, action items and linked records

Where can I trace how a task reached its current state?

The Task activity log records all changes to state transitions and all updates to start or end dates. Use it to trace a task’s history, especially after a bulk edit or a recovery member’s update.

Can a crisis manager add follow-up work to an open event?

From BCM release 9.0.x onward, crisis managers can create action tasks for recovery members or teams while a crisis event or an exercise is open. Action tasks suit follow-up work that appears after the first set of event tasks is in place. They can be created without mapping them to assets or recovery plans, and they are not included in the event recovery timeline. Use them alongside the planned tasks rather than rewriting those tasks.

How are nested plans and their dependencies handled?

Activated plan levels in an event are controlled by a system property, and the system creates nested plans within the event automatically, so you do not add each one by hand. To link activated plans to one another, update the Dependencies field in the event tasks.

How do I group duplicate tasks on a crisis event?

Use the Similar tasks groups tab on the crisis event. It lets you identify similar or duplicate tasks and group them, which reduces redundant work across the response team.

Can an issue be linked to a crisis event?

Yes. You can add an existing issue to the crisis event, or create a new issue from the event, to track a problem the team finds during the response. The Issues related list appears on a crisis event record when GRC: Profiles is installed. Removing an issue from the event does not delete the issue record.