OBLYTECH Logo
OBLYTECH Logo

Define malware analysis records

A malware analysis record stores the metadata and results of one static or dynamic analysis of a malware instance or malware family. It records the analysis product and version, the environment, the timing, the classification result and the analyzed observable. You can create one from the Threat Intelligence Security Center workspace or from the IoC Repository.

Which path to use and who can create the record

There are two ways to create a malware analysis record, and each one opens a form with a different set of fields. The workspace path opens the fuller form, with product, host, operating system and module fields. The IoC Repository path opens a shorter form built around the name, the analysis versions, the timing and the source. Choose the path your team already uses for threat records, so one analysis is not entered in two places.

Each path requires a different role, so confirm your access before you start:

  • Workspace path: role sn_sec_tisc.analyst.
  • IoC Repository path: role sn_ti.admin.

Field labels and menu names can differ between releases, so check each label on your own instance before you rely on the steps below. Teams that also work security incidents can read the security incident response workspace page and the process mining for security incident response page alongside this one.

Create the record from the Threat Intelligence Security Center workspace

Use this path when your analysts work in the Threat Intelligence Security Center workspace. The Malware Analysis object sits behind the Threat Intel Library icon on that workspace.

  1. Go to Workspaces, then Threat Intelligence Security Center.
  2. Click the Threat Intel Library icon on the workspace.
  3. Go to the Malware Analysis object.
  4. Click New.
  5. On the form, fill in the fields.

The workspace form holds the product, host VM, operating system, configuration version, modules, submitted date, analyzed observable, TLP, confidence and revoked fields. None of those appear on the IoC Repository form, so a run that depends on the environment or module details belongs on this path.

Create the record from the IoC Repository

The IoC Repository path runs through the All menu and ends with a Submit step.

  1. Go to All, then Threat Intelligence, then IoC Repository, then Malware Analysis.
  2. Click New.
  3. Complete the fields in the form as appropriate.
  4. Click Submit.

This form contains Name, Analysis Engine Version, Analysis Definition Version, Analysis Started, Analysis Ended, Source, Source ID, Result, Result Name, Created Time in Source and Modified Time in Source.

The description for the Name field refers to an intrusion set, so its wording does not fit a malware analysis. For a malware analysis, name the record after the run it describes, such as the sample and the run date, so a reviewer can tell two runs of the same sample apart.

Describe the analysis environment with the right identifiers

The product and environment fields tell a later reader how the sample was analyzed. A vague entry makes a run hard to rebuild, so take each value from the tool output for that run.

  • Product: the name of the analysis engine or product. Product names should be lowercase, with words separated by a dash. If the product cannot be named, enter anonymized.
  • Version: the version of the analysis product that was used.
  • Configuration Version: the alternative names used to identify the malware or malware family. The label says version, but the field holds names.
  • Modules: the analysis modules that were used and configured in the product during this run.

Host VM and Operating System are reference fields. Each value must be the identifier for a SCO software object, not a free-text description. Host VM covers the virtual machine that hosted the guest operating system during dynamic analysis. Operating System applies to virtualized systems as well as systems running on bare metal.

If Host VM is empty while Operating System is set, the analysis may have run on bare metal, or the environment details may have been redacted. A blank field does not show which case applies, so confirm it with the analyst who ran the sample before you finish the entry.

Record the timing and the scanner output

Fill the timing and version fields from the tool output for the run, not from the date you happen to create the record. Enter Analysis Started and Analysis Ended in the same time zone so the two values can be compared directly.

  • Analysis Started: the date and time the malware analysis was initiated.
  • Analysis Ended: the date and time the malware analysis was ended.
  • Analysis Engine Version: the version of the engine or product, including antivirus engines, that performed the analysis.
  • Analysis Definition Version: the version of the definitions the analysis tool used, including antivirus tools.
  • Result: the classification the scanner or tool analysis process determined.
  • Result Name: the classification or name the scanner assigned to the malware instance.

Result and Result Name have separate jobs. Result holds the classification, and Result Name holds the label the scanner used. Enter the scanner’s label as the tool reports it. If your library uses a different name for the family, keep that name out of Result Name and record it in Configuration Version instead.

Link the record to the observable and its source

A reader needs to trace the record back to the sample it describes. On the workspace form, select the observable that was analyzed in the Analysed Observable field. The handling fields below control sharing and provenance.

  • TLP: one of four colors, White, Green, Amber or Red, that indicates how sensitive the information is and who should receive it. Set it before the record leaves the analysis team.
  • Confidence: the confidence you hold for this malware analysis.
  • Source: the threat source the record was created from. On the IoC Repository form, Source ID holds the unique identifier for this object in that source.
  • Revoked: indicates that the record is no longer considered valid.

Use the related lists to add context

The IoC Repository path ends with a set of related lists you can open from the record. Each list adds context that the core fields do not hold.

  • External References: lists external references that point to non-STIX information, through one or more external object identifiers.
  • Associated Malware: lists the malware identified with this object.
  • Reported Observables: lists the observables reported as part of this object.

Use these lists to confirm that the record connects to the right malware and observables. An empty list means nothing of that kind is linked yet. For the governance side of the same work, see compliance case management.

Review the finished record as a reader who did not run the sample

A reviewer who was not part of the run should be able to answer five questions from the record alone: what was analyzed, with which product and modules, when the run took place, what the tool concluded, and how far the record can be shared. If any answer depends on memory or on a second document, the entry is not finished. Walk the record through those five questions before it goes to review.

Check the fields in this order. Start with the observable, because every other value describes it. Then check the environment, the timing, the result and the sharing fields. Confirm your role matches the path you used: sn_sec_tisc.analyst for the workspace and sn_ti.admin for the IoC Repository. Confirm Product is lowercase with dashes, or set to anonymized. Confirm Host VM and Operating System reference SCO software objects. Confirm Analysis Ended is later than Analysis Started. Confirm Result Name matches the scanner output for this run, and that TLP matches who should receive the record.

For help planning this work, see ServiceNow implementation.

Where entry errors usually start

The common failure here is a record that describes the tool rather than the sample. A correct product name with a blank version, or a result name copied from an internal label, makes two runs hard to compare. Treat the scanner output as the source for each value, and check each entry against it before you move to the next field.

A second pattern is a record that mixes two runs. The Modules field describes the configuration used during one analysis run, so a sample analyzed twice with different modules or definitions is easier to read as two records. That keeps each record’s timing, versions and result consistent with the run it describes.

Questions about malware analysis record fields and related lists

Why does Show Relationships not appear on a new record?

Show Relationships opens the STIX Visualizer, where you can view how the STIX object relates to other objects. The link appears only when the object has an associated object, so it stays hidden on a new record until an association is in place.

What belongs in Installed Software?

Installed Software lists non-standard software that was installed on the operating system used for the dynamic analysis. Standard components of that operating system are outside its scope, so the list shows only the software that was not part of the standard build.

Why does the Submitted date differ from the scanned date?

Submitted is the date and time the malware was first submitted for scanning or analysis, and it stays constant. The scanned date can change, for example when the sample is submitted to a virus analysis tool. Leave Submitted as the first submission, and use the analysis timing fields to describe the run itself.

What happens when I create an observable while recording an analysis?

On the workspace path, creating a new object record for an observable, indicator, entity or object also creates a source record. A prompt confirms that the new object record exists, and you are then redirected to the aggregated record. Check which record your open form now belongs to before you continue filling in fields.