An observed data record in ServiceNow Threat Intelligence captures when a cyber security-related entity, such as a file, system or network, was seen. You create it from the IoC Repository by opening Observed Data and clicking New, then entering the first and last observed times, the observed count, the source and the source ID.
What an observed data record holds
An observed data record works as a container for sightings. The objects it describes, which the STIX standard calls Cyber-observable Objects, are the things that were seen. The record holds when they were seen, how many times, and which threat source reported them. It can be built from raw data alone, such as analyst reports, sandbox output or network and host-based detection tools, because observed data is not an assessment of what the sighting means. Someone who opens the record later can judge whether a sighting is recent or repeated.
The record lives under the IoC Repository, next to the indicators of compromise that a threat source reports. Observed data says what was seen and when. An indicator of compromise is a separate record type. If that distinction is new to your team, read how an indicator of compromise is defined before you start entering sightings.
Before you open the form
Confirm that your account holds the sn_ti.admin role before you start. The procedure requires that role, so check it first rather than discovering the gap partway through a batch of entries.
Collect the timing and source details before you open the form. The form asks for the first and last times the object was seen, a count, the threat source, and that source’s identifier for the object. If the feed gives timestamps in mixed formats, convert them into one layout and one time zone in your working notes. The first and last times then compare directly with the times on other records.
If you are still scoping the wider rollout, the threat intelligence implementation roadmap is the place to plan where this record fits. For help planning this work, see ServiceNow implementation.
Entering a new observed data record
Work through the steps below in order. The field labels match the names on screen, so you can follow the list while the form is open.
- Open All, then Threat Intelligence, then IoC Repository, then Observed Data.
- Click New.
- Fill in the fields described in the sections that follow.
- Click Submit.
Setting the first and last observed times
First Observed holds the initial time the data was seen. Last Observed holds the last time it was seen. Take both values from the sighting history rather than from the moment you type the record. That way the window describes the sighting, not your data entry.
Setting the observed count
Observed Count records the number of times each Cyber-observable object was seen. The field takes an integer from 1 through 999,999,999. Enter the whole number the source reports. Because the field accepts only a whole number, a percentage or a score from the feed has no place in it.
Identifying the source and the object
Source names the threat source the record was created from. Source ID is the unique identifier for this object inside that threat source. Copy it exactly as the source issues it, including case and punctuation. The field is defined as the object’s identifier in that source, so a retyped value no longer identifies the object there.
Recording the source timestamps
Created Time in Source and Modified Time in Source record when the object was created and last changed inside the threat source. These can be earlier than your sighting window. Keep them apart from the sighting times, so you can read off how old the source’s view of an object is and how recently your environment saw it.
Checking the record after you submit
After submission, the record shows a set of related lists. Open each one to see what is attached to the object. Together they show how the record connects to the rest of the IoC Repository.
- External References lists external references to non-STIX information. Use it for one or more external object identifiers.
- Associated Observables lists the observables linked to this object.
- Indicators lists the related indicators of compromise that the threat source identified for this object.
- Infrastructure lists systems, software services, and physical or virtual resources associated with the object.
Reading the Show Relationships link
The Show Relationships link opens the STIX Visualizer, which displays how the STIX object connects to other objects. The link appears only when the object has an associated object, so it will not appear on a new record with no associations.
Relationship views are easier to read once several records share objects. For the indicator side of those connections, see how to define relationships between indicators.
A worked example with repeated sightings
Suppose a file is seen on a Monday morning, seen again later that week, and seen a third time after the threat source updates its entry. Make one observed data record for that file, not three. Set First Observed to the Monday sighting, set Last Observed to the latest one, and enter an observed count of 3.
The source fields need the same care. The update arrived with a modified time from the source, so that value goes into Modified Time in Source. Created Time in Source keeps the original creation time. Entering the update time as the creation time would make the object look newer than it is.
If the same file later appears in a second threat feed, create a second record for that feed. Source ID is scoped to its threat source, so the feed’s copy of the file needs its own record. Combining the two would blur which feed reported which sighting.
Common errors when entering observed data
The errors below tend to come up when records are entered in batches.
- Using the time you typed the record as First Observed or Last Observed, instead of the sighting time.
- Entering an observed count of 0 or a value above 999,999,999, both of which fall outside the field’s range.
- Retyping a Source ID by hand, which breaks the match with the threat source’s own identifier.
- Putting source timestamps into the sighting fields, which hides how recently the object was seen and how old the source’s copy is.
- Starting the entry without first confirming that your account holds the sn_ti.admin role.
For the wider configuration, see common ServiceNow threat intelligence mistakes and how to avoid them.
Keeping records consistent across sources
Consistency across records usually matters more than how many records you create. Create one record per threat source for each object, using that source’s identifier. Keep the time fields on the same basis across records, so that counts and windows from different feeds can be compared without conversion.
Write down the conventions you choose. Note the time zone used for sighting times, the spelling of each threat source name, and the rule for when an update creates a new record. Reuse those conventions on each new entry. The common failure here is a source named two ways in two records, which splits one feed’s history into two groups.
When you enter records in batches, check the first and last times on a sample of entries before you go on. A convention error caught early takes minutes to correct. The same error found after a large batch means rework across the whole set.
Questions about observed data records
Is an observed data record the same as an indicator of compromise?
No. An observed data record describes sightings of an object. Indicators of compromise attach to it through the Indicators related list, so the two can be linked, but they remain separate records.
Can one object appear in observed data from two threat sources?
Yes. The Source ID is the identifier inside one threat source, so the same object can appear in two records, one for each source.
Can the first and last observed times be the same?
Yes. A single sighting can produce matching times, and an observed count of 1 is a valid entry.
Are the form fields the same across releases?
The menu path, procedure and field list are the same in the Brazil, Australia, Zurich, Yokohama and Xanadu releases, so the steps above apply to each. Menu labels and layout can change between releases, so check the path on your own instance before you train others on it.
What should I do if Last Observed is earlier than First Observed?
Enter the times in order, from the initial sighting to the latest one. Check how your instance handles a reversed pair before you rely on that record in later analysis.