OBLYTECH Logo
OBLYTECH Logo

Share threat intelligence data between TISC instances

You can share threat intelligence data between TISC instances by manual sharing in the user interface, by automated flows, or through a TAXII server. Manual sharing and flows push records from the source instance to the target. TAXII works in the other direction: the target instance pulls records from collections on the source.

Pick a sharing method before you configure anything

TISC offers three routes for moving intelligence from one instance to another. Each route differs in who starts the transfer and which side does the work, so settle that question before you touch a template or a collection. If you are still deciding where the records should come from, start with threat intelligence feeds and sharing.

  • Manual sharing from the GUI. An analyst selects a record in the Threat Intel Library, builds an outbound sharing record and submits it to the target instance.
  • Automated sharing with flows. A flow builds outbound sharing records when a defined condition is met, using the template, record types and related-record setting that you choose in the flow action.
  • Sharing through a TAXII server. You group records into TAXII collections on the source instance, and the target instance pulls from those collections.

Manual sharing and flow-based sharing place the work on the source side at the moment a record is sent. A TAXII collection places the timing on the target side, because the target decides when to pull. That split changes who has to watch the process. A manual share needs an analyst at the source each time. A flow or a collection keeps running without anyone starting it, so the review and approval steps need to be designed in advance.

Share records manually from the TISC interface

Confirm roles and sharing templates

Users with the sn_sec_tisc.analyst or sn_sec_tisc.admin role can share intelligence from the GUI to external systems. Before a share starts, the outbound intelligence sharing templates must be enabled. Each template carries restrictions that decide whether all users can see it or only specific users or user groups can. When a user starts the Share Intelligence process, the list shows only the templates that user is allowed to use.

Create and submit the sharing record

  1. Go to Workspaces > Threat Intelligence Security Center > Threat Intel Library > Observables > All Observables.
  2. Open the observable record you want to share.
  3. Select Share Intelligence. The Select outbound intelligence template dialog box opens.
  4. Choose the sharing template from the lookup. The View default template inclusions (tables and attributes) link shows which tables and attributes the template includes.
  5. Select the check box labeled Automatically link related records of the selected intelligence to attach related records to the sharing record.
  6. Select Select to create the outbound intelligence sharing record.
  7. Make any changes that are needed, then select Save on the Outbound Intelligence Data form.
  8. Select Submit to send the sharing record.

The Details section fills itself from the prefilled inputs set on the Outbound Intel Sharing Templates page, so check those values before you submit rather than typing them again. The share feature is not limited to observables. Indicators and objects, such as attack patterns and threat actors, use the same feature.

Check what gets filtered out

Two controls can remove records before they reach the target. Exclusion rules skip any selected record that meets their criteria, and the controls on the sharing template filter the records that remain. When a record is skipped, an error message appears on screen and the excluded records are logged in the Activity Stream. Skipped records are not added to the intelligence records of that sharing record.

Review and edit the intelligence records

The Intelligence Records section lists every entity grouped in the sharing record. Observables come first, with child types such as File and IP Address beneath them. Indicators and objects follow. A relationships area shows six relationship types, each in its own table. Turn on Show lists at least with one record to hide tables that contain no data, and use Edit Columns to choose which columns appear in the list view. The relationship tables are easier to read once you understand how indicators connect to observables, which is covered in defining relationships between indicators.

Use Modify Records to change one or more records. A bulk edit clears the fields you select, and the value you save is applied to all of the selected records. Bulk edits can change optional fields only. Edits made inside a sharing record do not change the matching record in the threat intelligence library, so a changed attack pattern description stays in the sharing record.

Redact sensitive values before sharing

Select Enable Redaction to remove or mask sensitive content before the records leave the instance. The redaction library must be configured first, because the feature draws its categories and values from it. Once redaction is on, a Redaction Library icon appears in the right-side contextual menu and lists each category with its values. A matching value is replaced with a token in the form #{Category}#. For example, an organization name stored as a value under an Organization_Name category becomes #{Organization_Name}# in the shared record. Open the Review section last, after redaction, to confirm the record reads the way you intended.

Automate sharing with flows

Automated sharing creates an outbound sharing record without an analyst opening the library. The Automated Flows list includes a sample action named Automated sharing of high-risk IOC’s with trusted partners, and you can use its settings as a model for your own flow.

Roles for automated flows

A System Administrator can view, create and edit the automated flow. A user with the sn_sec_tisc.admin role can view it.

Configure the flow action

  1. Go to All > Threat Intelligence Security Center > Administration.
  2. Select Automated Flows.
  3. Select the action link for the sample sharing flow to open its rule in the flow designer.
  4. Check the trigger. The sample flow runs daily at 12.00.00.
  5. Open Actions and select the sharing template. A template can be selected for automated sharing when its usage mode is Automated Sharing, or both On-Demand and Automated Sharing.
  6. Select the observable types, indicator types and object types to add to the outbound intelligence record.
  7. Select Include Related Records to add the related records of the selected observables, indicators and objects.
  8. Select Requires approval if a person must review the record, then name the users and groups who approve it in the approval fields.
  9. Select Done.
  10. Activate the flow.

Activation is the last step in the sequence. The action creates real sharing records, so confirm each setting in the Actions list before you activate the flow, and keep the approval fields filled in if your process needs a review before a record leaves the instance.

Publish records through TAXII collections

TAXII collections are logical groupings of threat intelligence data. When sharing runs through a TAXII server, the target instance pulls from the collections you configure on the source. You decide what a collection holds, and the target decides when it reads.

Create collections and add records

Collections are created under Workspaces > Threat Intelligence Security Center > Administration > TAXII Outbound Server > TAXII Collections. Each collection takes a name, an expiry period and a versioning setting, and you decide who can read it. A flow can also fill a collection without anyone adding records by hand. To add individual records from the library, use the related task Add to TAXII Collections from Library List View, which appears only when a specific observable type is selected.

Check what a collection holds

Open the collection under TAXII Outbound Server and read its TAXII Collection Records section, which lists every record the collection holds. Check this before the target pulls for the first time, and again after you change an automated collection, so the contents match what you meant to publish.

Test one share before you rely on a method

Run a single manual share first, using a low-risk observable and the template you plan to use for the full set. Then check the draft sharing record. The Intelligence Records section should list the observables and related entities you expected, the redaction tokens should appear where you set them, and the excluded records should match your exclusion rules.

Once the manual test looks right, move the same template into a flow, and add the TAXII collection last. Each method adds a chain of settings that depends on the one before it, so testing in that order makes problems easier to trace.

Teams that skip this step often repeat the same few setup errors, which are covered in common ServiceNow threat intelligence mistakes. For where sharing fits in the wider build, the threat intelligence implementation roadmap is the place to start.

For help planning this work, see ServiceNow implementation.

Questions about sharing limits, visibility and releases

How many records can one outbound sharing record hold?

The system property shared_intelligence_entity_threshold sets the maximum number of individual records in a single outbound intelligence record. The default is 1000 records and the maximum is 10000. If a set is larger than the limit, split it across several sharing records.

Why is the Intelligence Records section missing from my sharing record?

That section is shown while the sharing record is in the Draft state and is hidden in other states, so review the records before you submit.

Where do I find the records that an exclusion rule skipped?

Skipped records are written to the Activity Stream as work notes. The shared_intelligence_exclusion_work_notes_count property sets how many rows each work note displays. Its default is 10 and its maximum is 100. When the list is longer than that, the rows are split across several work notes.

Which release do these steps describe?

These steps describe the Brazil release of TISC. The overview of the three sharing methods reads the same in the Australia, Zurich, Yokohama, Xanadu and Brazil releases. Check menu paths, on-screen labels and role names on your own instance, because the detail can differ from one release to the next.