OBLYTECH Logo
OBLYTECH Logo

Confirm potential relationships between indicators

To confirm a potential relationship between indicators in ServiceNow Threat Intelligence, an analyst with the sn_sec_tisc.analyst role opens the Threat Intel Library from the Threat Intelligence Security Center workspace, goes to Potential Relationships, selects the observable record, and clicks Confirm Relation. The record then moves to the Relationships section.

What a potential relationship record represents

A potential relationship record is a proposed link between two observables. Correlation rules identify these records. Treat each one as a suggestion, and remember that confirming it is your decision that the pair holds up.

The Potential Relationships menu splits this work into two lists, indicator-indicator and Observable-Observable. Both lists use the same confirm step, so open the list that matches the pair in front of you. For the indicator side of these relationships, read how relationships between indicators are defined before you start a review.

Roles and release checks before you start

Both confirmation procedures require the sn_sec_tisc.analyst role. Check that your user holds that role before you open the workspace, so you can finish the Confirm Relation step without stopping partway through a review.

The manual linking steps from an observable record do not name a role. Do not assume that any user can link observables on that basis. Ask your administrator which role your instance requires for that path before you rely on it.

The Yokohama, Zurich, Australia and Brazil releases use the same menu path, the same button labels and the same role for the confirmation steps. Check the steps on your own instance and release, since labels can change between versions.

Confirm an indicator-indicator potential relationship

Use this path when the potential record you are reviewing appears in the indicator-indicator list.

  1. Navigate to Workspaces > Threat Intelligence Security Center.
  2. Click the Threat Intel Library icon on the workspace.
  3. Go to Potential Relationships > indicator-indicator.
  4. Select the observable record.
  5. Click Confirm Relation.

Open the observable record and read its type and values before you click Confirm Relation. Confirming moves the record to the Relationships section, so the review belongs before the click, not after it.

Confirm an observable-observable potential relationship

The Observable-Observable list uses the same confirm step, but the selection step differs. You select one or more observable records, so one confirmation can cover more than one record. Group records only when they are the same kind of observable, and check the type on each member before you group them.

  1. Navigate to Workspaces > Threat Intelligence Security Center.
  2. Click the Threat Intel Library icon on the workspace.
  3. Go to Potential Relationships > Observable-Observable.
  4. Select the observable(s) record.
  5. Click Confirm Relation.

Use the labels exactly as the menu shows them. The indicator entry is written in lowercase, while Observable-Observable has capital letters on both words.

Review order and judgment before you confirm

Work a queue in a fixed order so that the same kind of pair gets the same treatment from one session to the next. Group the records by the observable type they carry, then start with the pairs whose values you can compare directly. Pairs whose values only resemble each other take longer. Separating a real connection from a coincidence is judgment work, so give it time and write down what you saw.

Keep each review tied to what the record shows. A shared word in one field is a reason to look, not a reason to confirm. Read the rest of the record, including its Related Records tab, before you decide.

Check the result after you confirm

After Confirm Relation, the observable record moves to the Relationships section. Look for the record there to check that the step worked. If the record is not there, reopen it and check that you clicked Confirm Relation in the list that matches the pair.

Write a short note in the case or investigation record. Include the pair, the list you used, the reason you confirmed it, and the time. A relationship that appears later without a note is hard for the next analyst to explain.

Link two observables manually from a record

Use the manual route when you have a pair that needs to be connected and no potential record exists for it. Start from the observable record you are working on. The Link route creates a new relationship between the selected observable record and the observables you link, so the starting record matters.

  1. Open any Observable record.
  2. Go to Related Records tab.
  3. Click the Link button.
  4. Select one or more observable(s).
  5. Click Link.

The result is a new relationship, not a potential relationship record. The Related Records tab also supports confirming potential relationships, so a pair that already has a potential record can be reviewed there. Record the reason in your notes, as you would for a confirmation. Select only the observables you have checked, because each observable you select creates a new relationship that someone may have to remove later.

Remove a relationship you no longer want

The Link route ends with a Delete step, and clicking Delete removes the relationships you have selected. There is no undo step, so check the selection before you click.

On the Related Records section, Delete removes the associated observables, so read the selection with extra care there too. Use Delete to correct a relationship that turned out to be wrong, and write a note first, so the next analyst knows why the link existed and why it was removed.

Common mistakes that cause rework

Four mistakes commonly cause rework in these reviews.

  • Working in the wrong list. The steps are the same in both lists, but a pair belongs in one of them. Opening the other list slows the review and makes the record harder to find.
  • Confirming on a shared value alone. A single matching field is a reason to look at the pair, not a finding in itself.
  • Linking from the wrong starting record. The manual route creates the relationship from the record you open, so a wrong starting point produces a wrong relationship.
  • Deleting without a note. A relationship removed with no reason recorded leaves the next analyst with nothing to check.

Checks to run before and after confirming

  • Confirm that the list you opened matches the pair you are reviewing.
  • Read the values on each observable record before you click Confirm Relation.
  • Check that your user holds sn_sec_tisc.analyst before you start a batch.
  • After confirming, find the record in the Relationships section.
  • After a manual link, open the Related Records tab and check that the new pair appears.
  • Write the pair, the path you used and the reason in your notes.

What to do when an expected pair has no record

If a list shows no record for a pair you expected, check the list first. Confirm that you opened the indicator-indicator or Observable-Observable list that matches the pair, then check the values on each observable. If the pair still does not appear, the manual Link route connects the two observables.

If the indicator itself is missing, begin with defining an indicator of compromise, then return to the review. The overview of indicators and observables in Threat Intelligence is the place to start if the object types on these records are new to you.

Plan a large review before you start. A short written list of the lists you will work, and the pairs you expect to link manually, keeps a batch consistent from one session to the next. For help planning this work, see ServiceNow implementation.

Questions about linking and removing indicator relationships

Does a manual link create a potential relationship record?

The Link route creates a new relationship between the selected observable record and the observables you link. The result is not a potential relationship record. Check the observable’s Related Records tab for the new pair, since that is where the link starts.

What does Delete remove when I click it?

On the Link route, Delete removes the relationships you select. On the Related Records section, Delete removes the associated observables. Either way, check the selection before you click, because there is no undo step.

Should I confirm a record or link the pair manually?

Use Confirm Relation when a potential relationship record already shows the pair, since that record is what the confirm steps act on. Use the manual Link route for a pair you need connected when no record exists. Neither route outranks the other, so the list you are working from decides it.

Why does a confirmed pair sometimes not show as a confirmed relation?

A confirmed relation displays only when the correlation rules match the pair. For example, two URL observables with the same domain name match. If a pair you confirmed does not match in that way, keep your reason in the case notes.