Indicator sources are normally tracked automatically during the threat import process, and you can add more by hand from the Indicator Sources related list. Observables work differently. With no sources defined, an observable uses all types of sources, and adding one or more threat sources limits it to the ones you pick.
What the threat import records for an indicator
When an indicator comes in through the threat import, the source it came from is normally tracked on the record. Treat that as your starting point. Open the indicator, read the Indicator Sources related list, and note what is already there before you change anything. An indicator that came through the threat import may already show the source you were about to add, and a duplicate adds clutter to the record.
Manual additions fill the gap. Suppose an analyst has a vendor advisory or an internal investigation note that supports an indicator, but the import did not connect that material to the IoC. Adding the source by hand keeps the record complete for the next person who reviews it, and that person can see the reasoning in the note. The indicator itself stays the same, and its source list is what grows.
If the term IoC is still new to your team, read the guide on defining an indicator of compromise before you change any records. For how indicators and observables fit together, see the overview of indicators and observables. The rest of this page assumes you already know what an indicator record holds.
Add an indicator source to an IoC by hand
Adding a source to an indicator requires the sn_ti.write role. Use the menu path and control labels exactly as they appear on screen.
- Open All > Threat Intelligence > IoC Repository > Indicators.
- Select the indicator that needs another source.
- Open its Indicator Sources related list.
- Click Edit.
- If needed, use the filters to find the indicator source you want.
- In the slushbucket, move that source into the Indicator Sources list.
- Click Save.
After you save, reopen the related list and check that the new entry appears. If it does not, adjust the filters and look again. If the source still cannot be selected, check your role before you try again, because this change needs sn_ti.write.
Review a batch of indicators in a fixed order
When you have several indicators to check, run each record through the same sequence. Open the indicator, read the sources already attached, decide whether the import has covered what you know, and then open Edit when something is missing. Working this way stops you from adding a source the import already tracked, which would leave a duplicate entry on the record.
Keep a short note for each record as you go. Write the indicator name, the source you added or the reason you left the list alone, and the date you reviewed it. A reviewer reading the record later needs this reasoning when a source is questioned, so a note that takes one sentence to write saves a question later. A bare list of sources shows what changed but not why, and the why is what they need when a source is questioned.
Group the records by the kind of source they need. Indicators that need the same type of source can often be handled in one pass, which cuts down on switching between records.
Add an observable source and understand the narrowing effect
Observable sources use a different role. Adding one requires sn_ti.admin, not sn_ti.write. An analyst who can edit indicator sources may still need an administrator to make the same kind of change on an observable, so confirm the role before you plan the work.
The behavior is the part to understand first. An observable with no sources defined uses all types of sources. Once you add one or more threat sources to it, the observable is limited to the sources you chose. The first addition is therefore a narrowing step, not an addition in the simple sense.
Use these steps on the observable record.
- Open All > Threat Intelligence > IoC Repository > Observables.
- Select the observable that needs a source.
- Open the Observable Sources related list.
- Click Edit.
- Narrow the list with the filters if the source is hard to find.
- In the slushbucket, add the observable source to the Observable Sources list.
- Click Save.
Check the result in the related list after you save. It should show the sources you intended and nothing you added by mistake.
Decide which observable sources to keep
Before you add the first source to an observable, write down the sources you expect it to use and the reason each one belongs. A short list in your change note is enough. The usual failure is a list nobody can explain later, when someone asks why an observable stopped drawing on a source they expected it to use.
Keep indicator-level and observable-level decisions separate. Indicator sources attach to one IoC, and observable sources attach to one observable. A source that suits an indicator may not suit a related observable, so review each record on its own terms rather than copying a choice from one to the other.
When two sources disagree about an indicator, do not add both just to be safe. Pick the source that best supports what the IoC claims, and note the disagreement in the change record so the reviewer can see that you saw it. Adding both hides the conflict, and the conflict is what a reviewer needs to see.
For help planning this work, see ServiceNow implementation.
Link source changes to the rest of the IoC workflow
Source decisions rarely stand alone. An indicator sits inside a set of related records, including the observables it connects to, the attack modes or methods it is linked with, and the tasks that act on it. The related tasks the team will use alongside these steps are:
- View an IoC
- Add a related observable to an IoC
- Add a related attack mode/method to an IoC
- Identify associated indicator types
- Add associated tasks to an IoC
Read the relationship work before you change sources. A relationship can change how a source choice reads on the record, so the two decisions are easier to check together. For the relationship steps, read how to define relationships between indicators.
Checks before a reviewer sees the change
- Confirm you opened the right record. The indicator or observable name should match the change you intended.
- Confirm the role for the record type: sn_ti.write for indicator sources and sn_ti.admin for observable sources.
- Reopen the related list after you click Save and read the entries again.
- Compare the new source with what the import already tracked, so you have not added a duplicate.
- Write the source name and the reason in the change note.
For a wider set of errors to watch for during record reviews, read the guide on common Threat Intelligence mistakes and how to avoid them.
Questions about indicator source and observable source behavior
Can an indicator hold imported sources and manually added sources at the same time?
Yes. The import normally tracks sources automatically, and manual additions go into the same Indicator Sources list, so the record can show both kinds side by side.
Does adding a manual source replace the one the import tracked?
The steps on this page describe adding a source to the list. They do not describe removing or replacing one, so confirm how your instance handles that before you plan a replacement.
What should I do if the source I need does not appear in the slushbucket?
Adjust the filters to widen or narrow the search, then check that the source exists in the list you are working from. If it still does not appear, raise it with whoever maintains the source list rather than adding a near match.
How often should indicator sources be reviewed?
Review them when new evidence arrives, such as an updated report or a feed that changes what an indicator is linked to, and when a record is escalated for a second look. A fixed calendar review can sit alongside these triggers for large sets of records.
Do these steps apply to all releases?
The steps on this page cover the Brazil, Australia, Zurich and Yokohama releases. Menu names, roles and related lists can differ on a release outside that range or on a customized instance, so check each step on your own instance before you write it into a team procedure.