ITSM Workforce Optimization: Scheduling and Adherence

Scheduling in Workforce Optimization for ITSM lets a manager build shift plans, group them into schedule plans, assign agents, and publish the result to a team calendar. Schedule adherence then compares the time an agent actually worked with the shift that was planned, and conformance measures the total work completed regardless of when it happened.

What the Scheduling Module Covers

Scheduling gives a manager one place to plan coverage for a team, and it gives agents a way to see their own calendar and act on it. Access is controlled by roles. The shift planning user role grants read access to schedules and shifts. The shift planning agent role lets agents see their calendar and ask for shift swaps or time off. The shift planning admin role adds create, read, update and delete rights on schedules and work shifts.

Teams that plan customer service rather than IT can compare this setup with the Workforce Optimization for CSM guide, which covers forecasting and scheduling for that side of the business.

Administrators plan shifts with staggered breaks, publish schedule plans, and manage time-off requests and shift swaps. Agents look up the team schedule, add events, request time off, and swap shifts with peers.

Building a Schedule Plan Step by Step

A schedule plan is the container for a span of time. It holds the shifts for that span and the agents who work them. To create one, open the Manager Workspace, select the Schedule icon, switch to the Team Calendar tab, and open the schedules panel from the side panel. Use the plus icon to start a new plan.

Give the plan a name, choose a start date and an end date, and assign it to groups. Save the schedule, then add a work shift with an event type that categorizes it, and assign agents in the assign agents field. If you copy an existing plan instead, the copy is set to Draft, its end date is set 30 days out, and its start date is set to the current date.

Publishing, Unpublishing and Changing a Schedule

Saving a work shift in the team calendar generates a preview. When the plan is right, choose Publish, and agents can then see their shifts ahead of time.

Unpublishing depends on timing. If the start date is today or already in the past, the schedule stays Published and its end date moves to tomorrow. If the start date is still in the future, the schedule drops back to Draft. Deleting a group from a plan removes that group’s agents from the shifts and returns the schedule to Draft, so refresh the calendar and check coverage after any group change.

Time Off and Shift Swaps

Agents can request time off, and they can trade shifts with a peer. Time-off requests go to the agent’s manager for approval. Agents approve peer shift swaps in the ITSM Mobile Agent application, and the approval flows decide which managers may approve time-off and swap requests.

If an agent submits a time-off request within two days before its start date, the approval flow rejects it automatically. An administrator sets that cut-off in the due-date script of the approval flow in Flow Designer.

A manager can also swap shifts directly. From the Team Calendar, open the pop-up for the shift you want to move, select the Shift Swap icon, choose the agent who can work that shift in the Requested Shift section, and submit. This route skips the approval process, and the team calendar displays the updated schedule once you submit. Use it with care, because it changes who is on shift.

Event Categories and Calendar Events

Each calendar entry belongs to an event category. The defaults are Work, Meeting, Training, Custom Event, Time Off and Break. A category can be excluded from the coverage check.

Custom events go through the event type extension points. Before building one, decide who may create it, whether it needs approval, and whether it is a work-type or non-work event.

How Schedule Adherence Is Measured

Schedule adherence and conformance are generated from clock events. A clock-in is recorded at login or when the agent changes presence to Available. A clock-out is recorded at logout or when the agent changes presence to Offline or Break. If an agent forgets to clock out, the system generates the clock-out automatically, by default 60 minutes after the shift ends.

Each day, the system builds a time worked summary for each agent, with planned work, time not worked, time actually worked, and the adherence and conformance percentages.

The default formulas work like this. Adherence is the minutes worked inside the shift, divided by the scheduled shift minutes plus any overtime. Conformance is the minutes worked inside the shift plus overtime, divided by the scheduled shift minutes. Adherence penalizes time away from the schedule, while conformance counts the work done, whenever it was done.

A worked example makes this concrete. Take a 7.5-hour shift, which is 450 planned minutes, with a 25-minute midday break and 40 minutes of overtime. The agent clocks in at the start, clocks out for the break, and clocks back in, so the minutes worked inside the shift are 425.

Measure Calculation Result
Planned shift time 7.5 hours 450 minutes
Minutes worked in shift 450 minus the 25-minute break 425 minutes
Schedule adherence 425 / (450 + 40) 86.73 percent
Conformance (425 + 40) / 450 103.33 percent

Available non-planned time is clocked-in time outside a scheduled event, so a training an agent forgets to clock out of is recorded as available time, not training.

Monitoring Adherence in the Manager Workspace

A manager checks adherence from the Schedule icon in the Manager Workspace. The Schedule Adherence tab shows adherence and conformance as percentages for the organization or for a team, and clicking a bar opens more analytics. The Team Calendar tab shows planned against actual work for each team member. Select a date, then click the bar that represents an agent’s actual time worked to see the summary.

Figures for non-adherent agents appear in red, so an unusual result is visible before you open the detail.

For history, open the Lists icon and use the Schedule Adherence category. Time Worked Summary and Time Attendance show past days. Look for patterns rather than single bad days.

Setting Thresholds and Properties

Adherence settings sit under Shift Planning, then Schedule Adherence and Settings, and need the administrator role. Agree the thresholds with operations before anyone is measured against them.

The early check-in threshold defaults to 60 minutes, so an agent who starts within that window before the shift is not treated as non-adherent. The adherence threshold defaults to 70 percent. Conformance has a lower threshold of 80 percent and an upper threshold of 120 percent, and an agent outside that range is treated as non-conformant. The automatic clock-out threshold defaults to 60 minutes.

Check the values of any other schedule properties on your own instance before you rely on them. Background job mechanics are set out in the scheduled job explainer.

Extending Adherence and Event Logic

The extension point for the adherence formulas lets a developer script a different adherence and conformance calculation. Change the default formula when it clearly does not fit, and record the change so past numbers can still be explained.

Before buying Workforce Optimization for a new ITSM instance, what lifecycle and support evidence should the buyer obtain in writing?

Get written confirmation of four things before signing: whether the Workforce Optimization for ITSM application can be installed on your new instance, whether your contract entitles you to it, the support end date or a statement that none has been set, and the replacement and transition terms if the module is retired.

Confirm the installation path for your instance

As of November 2026, the module is being prepared for future deprecation and will no longer be installed on new instances. A sales conversation can still describe it as available, so ask for the install path in writing. Request the release name, the application name and version that would be installed, and a statement that this install is open to your instance on the purchase date.

Get the deprecation timeline in dated terms

As of November 2026, the module continues to receive support, but its lifecycle documentation gives no final support-end date. Record that as the state of the evidence rather than filling the gap with an assumed date. Ask for the date of the notice, its document reference, whether a support-end date will be announced, and how much notice the vendor commits to giving before support stops.

Confirm what your contract actually entitles you to

Product availability and contract entitlement are separate questions. In the legacy packaging, Workforce Optimization was a documented optional add-on for Pro and was historically included with Enterprise. Do not assume a legacy entitlement carries over to a new purchase. Ask for a written entitlement schedule that names the module, the package it sits under, and whether the rights cover production and subproduction instances.

Ask for support and patching commitments in writing

  • The release families and patch levels the module will receive, and for how long
  • Defect severity levels and response targets for the scheduling and adherence functions
  • Who tests the module when you upgrade the platform, and what happens if it fails
  • Whether a named replacement capability exists, and what the migration path looks like

Ask for export and exit terms before the first build

Ask whether schedule plans, shifts, event categories, adherence thresholds and time-worked history can be exported in a documented format. Ask whether the vendor provides migration tooling or only guidance. Ask whether your agreement lets you step down or exit without penalty if the module is retired before the term ends. An answer of “we will confirm later” should count as no answer.

Assemble the evidence in one dated file

  1. The install statement for the new instance, naming the release and application version
  2. The dated deprecation notice, with any announced support-end date or confirmation that none is set
  3. The entitlement schedule showing the module under your contract
  4. Patch, defect and severity commitments for the release you will run
  5. Export, migration and exit terms
  6. The name of the person at the vendor accountable for each answer

Frequently asked questions

Does overtime count toward adherence?

Yes. In the default formulas, overtime is added to the scheduled minutes for adherence and to the worked minutes for conformance. The worked example on this page shows how the two figures change with 40 minutes of overtime.

What happens if an agent forgets to clock out?

The system generates a clock-out event automatically. By default this happens 60 minutes after the shift ends, and an administrator can change that threshold in the adherence settings.

Can an agent swap a shift without approval?

An agent’s swap request goes through an approval, and a time-off request is rejected automatically if submitted within two days before the start date, and an administrator can change that cut-off in the approval flow. A manager can swap a shift directly from the team calendar, which skips the approval process.

What is the difference between adherence and conformance?

Adherence measures how closely an agent worked within the planned shift. Conformance measures the total work completed, whatever the timing, so an agent can score well on conformance and still have lower adherence.

What the Brazil Deprecation Notice Means for Planning

From the Brazil release, Workforce Optimization for ITSM is being prepared for deprecation. It will be hidden, no longer installed on new instances, and still supported. A team that runs it should record its plans, thresholds, event categories and property values, and a team choosing it for the first time should weigh that notice before building.

If a property change does not show straight away, reopen the Schedule Adherence settings form and check the saved value before you assume the change failed.

Next Steps for Your Team

Start a staffing review with the last few weeks of adherence figures, compared against your thresholds. The ITSM optimization service page covers the tuning work for ITSM teams. For the coaching side, the ITSM coaching guide explains how to turn an adherence gap into a development plan, and the ITSM on-call schedule guide covers the separate rotation for teams that need out-of-hours cover. The ITSM hub lists the other ITSM topics on this site.