OBLYTECH Logo
OBLYTECH Logo

Import assets using a template

To import assets using a template, open the destination stockroom in Hardware Asset Workspace, download the Excel template, and enter the asset details. Import the completed file, review row validation, then select Receive for eligible rows. Valid details can create new asset records and place them in the receiving stockroom.

Prepare the stockroom and the receiving data

The template workflow supports hardware and consumable assets, including assets that already have records and assets that need records created. The role required for this import and receiving procedure is ham_admin. Start by identifying the physical stockroom receiving the shipment and separating the asset details from any assumptions about what is already recorded.

For example, a delivery of computers needs identifiers and model information that describe the actual devices. A spreadsheet containing a quantity and a product description is insufficient when the model category requires a serial number. Collect the details before uploading so that the resulting validation tells you about genuine data problems rather than unfinished preparation.

Check the workflow on your instance and release: current navigation uses Import receiving log and the Create New Import asset data form, while older screens may use Import assets and Create New Import asset. Standardized bulk receiving is available from Hardware Asset Management version 13.0.0; receiving against purchase order lines requires Zurich or later.

This page concentrates on preparing the template and creating missing records through receiving. For the surrounding receiving process, see import and receive assets in bulk at a stockroom.

Import assets using a template from the selected stockroom

  1. Open Workspaces, then Hardware Asset Workspace, and select Inventory.
  2. Choose All stockrooms and open the stockroom where the assets are being received.
  3. Select Import receiving log, then Download Template.
  4. Complete the downloaded Excel template with the assets to be received and save the file.
  5. On Create New Import asset data, enter a recognizable value in Name.
  6. Select Attach file, choose the saved template, and select Import.

Use an import name that your receiving team can associate with the delivery. As an operating practice, keeping the stockroom and shipment reference in your working notes makes it easier to distinguish corrected uploads from the original attempt. Preserve the completed spreadsheet alongside those notes so that the person resolving a row can inspect what was submitted.

After import, the Import asset data rows tab contains the uploaded rows. Their appearance can take time when the file contains many records. Wait for the rows to appear before deciding the upload failed. The import stores row data and validation results in Import asset row [sn_itam_cmn_import_asset_row]. Upload completion and asset receipt are separate checkpoints.

Fill identifiers, model details, and quantities deliberately

Identify an existing asset or describe a new one

Asset tag and Serial number help determine whether a matching asset record exists. Model category, Model name, and Model number supply model information, with validation requirements depending on the category. For the Computer model category, a serial number is required. When no asset record is found, model information is needed to create the record using the supplied identifiers.

Review the spreadsheet against the shipment before importing it. Check that a serial number belongs to the device described on that row and that model details are consistent with the equipment received. Treat duplicate serial numbers as a data issue to investigate, rather than changing an identifier merely to make validation pass. Manufacturer records the asset manufacturer.

Record creation also needs a clear purpose beyond spreadsheet completion. If the team is unsure how an asset record relates to configuration data, use the distinction between ITAM and CMDB to frame that discussion before assigning ownership of the import.

Apply the correct quantity and source reference

Set Quantity to 1 for hardware assets. For consumables, enter the quantity being received; partial receipt of a consumable quantity is not supported by this workflow. Review hardware and consumable rows separately because applying one quantity convention across both can make an otherwise complete file invalid.

Source type identifies the receiving workflow: TOL represents a transfer order line, POL a purchase order line, and RMAL an RMA. Source ticket contains the associated line reference, such as the transfer, purchase, or RMA line number. Both fields are required for consumables so the workflow can identify the correct asset to receive.

The template also includes Reserved for and Parent asset. MAC address and OT entity are required to identify and receive OT assets. Do not interpret the presence of a template column as evidence that any asset structure is eligible: child assets and asset bundles cannot be received through this mechanism.

Read validation before selecting Receive

The Status column determines the next action for a row. Read it together with Alert, which explains the problem and the corrective action. A missing existing asset is treated differently from invalid spreadsheet data, so the word error alone is insufficient grounds to discard a row.

  • Ready to receive: The supplied data passes validation and the asset is eligible for receipt.
  • Receive error (Asset not found): No existing asset matches, but the supplied details are valid. Selecting Receive creates the asset record.
  • Import error: The submitted data is invalid, for example because serial numbers are duplicated or a hardware quantity is incorrect.

For Import error rows, correct the spreadsheet and create a new import record with the corrected template. Keep track of which rows were already received before preparing that correction. As a reconciliation practice, distinguish unresolved rows from completed receipts rather than assuming the entire original file needs to be processed again.

Other validation checks include required fields, quantity, source details, and whether a purchase order line’s model matches the asset model. Enterprise assets require the Enterprise Asset Management application to be activated; OT assets require OT Asset Management. Review the row alert when these conditions affect the shipment instead of treating a different model value as a workaround.

For help planning this work, see ServiceNow implementation.

Receive eligible rows and reconcile the result

Select the import rows corresponding to the assets being received, then select Receive. Eligible selections include Ready to receive rows and valid rows with Receive error (Asset not found). For a new asset, this action is the point at which the missing record is created, rather than the earlier file upload.

For existing assets received from Ready to receive, State changes from In transit to In stock and Substate changes from Reserved to Available. The Stockroom field changes to the receiving stockroom, and associated source workflow receive tasks close. Check a received asset against the intended destination rather than relying on the import name as proof of location.

For newly created records, State is In stock and Substate is Available, with Stockroom populated for the destination. Closing an associated source workflow receive task requires Source type and Source ticket to have been supplied. A record in the stockroom and a closed workflow task are therefore separate results to reconcile.

Compare the physical delivery, completed receipts, and outstanding alerts before handing the shipment over to stockroom operations. If lifecycle planning follows receipt, lifecycle templates for calculated asset lifecycles address that later planning concern. Keep the receiving check focused on identity, quantity, location, and source workflow completion.

Questions about organizing template imports

How should a team divide a mixed delivery into files?

Consider dividing the preparation by destination stockroom and by the people responsible for resolving exceptions. This is an operating choice, not a stated file requirement. A smaller, clearly owned set can make it easier to compare receiving results with the physical shipment and identify which corrections remain outstanding.

What should a receiving handoff contain?

Keep the import name, shipment reference, responsible person, and unresolved row notes together. Include enough detail for another operator to distinguish an identifier problem from a model or source reference problem. A handoff should tell the next person what needs investigation without requiring them to reconstruct the delivery from memory.

Who can change the processing batch size?

The admin role can adjust sn_itam_common.receive_assets_batch_size. Its default is 1,000 records per batch, and the property supports domain separation through the application property. Treat a change as a performance decision for the administrator; a spreadsheet preparer should not interpret the default as a limit on file rows.

What should be agreed before the next shipment arrives?

Assign responsibility for supplying serial numbers, checking models, and providing source line references. Agree who will reconcile physical quantities and who will investigate alerts. These preparation decisions reduce ambiguity when receiving starts, especially when purchasing staff and stockroom operators hold different parts of the information needed for a complete row.