OBLYTECH Logo
OBLYTECH Logo

Rescan Qualys vulnerable items from the Vulnerability Response workspaces

To rescan Qualys vulnerable items, open a vulnerable item or remediation task assigned to you in the IT Remediation Workspace, click Rescan, choose an option profile and request the scan. The scan runs on demand between scheduled scanning cycles, so you can check a fix without waiting for the next scheduled run.

Activate the Qualys scanner before you look for the Rescan button

The Qualys scanners are deactivated by default in the Vulnerability Response application. Until one is active, vulnerable items and remediation tasks that use it as a source do not show the Rescan button. An administrator with the sn_vul.vulnerability_admin role turns the scanner on as follows:

  1. Go to All > Vulnerability Response > Vulnerability Scanning > Scanners.
  2. Open the scanner product record you want to use.
  3. Select the Active check box.
  4. Click Update.

After the next import, Qualys appears in the Source field on vulnerable item and remediation task records, and Rescan becomes available as a UI action. Menu paths can change between releases, so confirm them on your own instance before you brief a team.

If the Rescan button is still missing after activation, check the Source field on the record. Qualys appears there only after the next import, so the button may stay hidden until that import has run.

Confirm roles and record eligibility before you request a scan

Two things decide whether you can start a rescan: the role you hold in each workspace, and the state of the record in front of you.

  • The IT Remediation Workspace requires the sn_vul.remediation_owner role.
  • The Vulnerability Manager Workspace requires the sn_vul.vulnerability_analyst or sn_vul.vulnerability_admin role.

When you rescan from the IT Remediation Workspace, the vulnerable item or remediation task must be assigned to you. Check the assigned user first, because a record assigned to someone else will not offer the option. Remediation tasks have two more conditions:

  • The remediation task can be in any state other than Closed.
  • All associated vulnerable items must come from the Qualys product.

A remediation task that mixes Qualys items with items from another scanner is not eligible, so split the work before you start. The Source field on each record shows its scanner, which makes that check quick. If your team also works in the classic environment, that environment has a separate Qualys rescan procedure. The steps in this guide cover the workspace.

Run the rescan from a vulnerable item or remediation task

Start the request from the record

  1. Open a vulnerable item or remediation task that is assigned to you.
  2. In the upper right of the record, click Rescan.
  3. In the Rescan modal, choose an option profile.
  4. Click Request rescan.
  5. When the message “The scan request is being processed” appears, click the View status link to open the scan record.

Choose an option profile

Option profiles contain the Qualys scan settings, so the choice you make in the modal changes how the scan runs. The modal offers two paths:

  • Use default option profile applies the profile set as the default for the integration instance when you set up the scanner.
  • Specify option profile opens the Option profile list, so you can pick a profile for this scan.

Pick a specific profile when the configuration items in scope need settings that differ from the default. Otherwise the default keeps things simpler, because you do not have to explain a second set of settings to the remediation owner.

Write down the profile you chose next to the VSCAN number in your own tracking. If a later scan returns different results on the same items, a written note shows which settings were used without reconstructing the request from memory.

Rescan a remediation effort

A rescan started from a remediation task scans all vulnerable items associated with that record, not just the one you have open. After the request, open the Source list on the scan record and compare its item count with what you expected to verify. If the two differ, find out why before you act on the results.

Track the scan record and its child scans

The scan record carries a VSCAN number, and its related lists show what the request covers and what came back:

  • Details shows the parent scan number, the scanner source and the state.
  • Scans lists the child scans and their states.
  • Source lists each vulnerable item used for the scan, with its configuration item, vulnerability, item state and remediation status.
  • Scan Summary shows the completed and failed scans.

Read the parent and child states together

The parent scan moves to Complete once all child scans finish. If the parent stays open, check the Scans list line by line rather than relying on the header.

Scan Summary lists the failed scans as well as the completed ones, so check it alongside the header. A Complete parent does not on its own confirm that every item was covered.

The Source list on the scan record is the direct evidence of coverage. It names each item the scan used, so a gap there shows which item to chase before you read anything into the parent state.

Checks to run after the scan completes

Work through these checks once the parent scan is Complete and Scan Summary holds no unexpected failures:

  1. Compare the Source list with the remediation effort and confirm each item you expected is present.
  2. Note the remediation status shown for each item, so you have a baseline for later comparison.
  3. Keep the remediation task open in your tracking until the results are confirmed.

Once the import has run, use the guide on checking detection data after an integration run to confirm the results reached the records.

Plan rescans around the scheduled import

In practice, rescans are easier to manage as part of a planned remediation push than as a reaction to each ticket. One workable pattern assigns the records to the people who will act on them first, groups items by remediation task where the task already holds the set, and sets a review date after the next scheduled import. That order keeps rescan results and record states in line.

Handoffs go more smoothly when the remediation owner receives the scan context along with the task. Send the VSCAN number, the option profile, the item count from the Source list and any failed child scans in one message. The owner then knows what was checked, what was not, and when the record should change.

Read the vulnerable item lifecycle guide before you set those dates, because the states a record moves through affect when the fix shows as closed.

If your environment also runs Tenable scanners, the Tenable rescan steps for the workspace cover that product. Keep the two scanner sources apart on any one remediation task, since a task with mixed sources is not eligible for a Qualys rescan.

For help planning this work, see ServiceNow implementation.

Questions about Qualys rescans in Vulnerability Response

Why does a vulnerable item still show its old state right after the scan completes?

The scan itself does not move the item to its new state. Vulnerable items that have transitioned, or will transition, to Closed/Fixed are brought in with the next scheduled import of the Qualys integrations. Until that import runs, the record can show the earlier state, even though the scan has already completed.

Does a scan that passes the tracking window still finish?

Yes. The tracking window sets how long the ServiceNow AI Platform keeps checking the rescan status. When that window ends, status tracking stops, but the time-out does not stop the scan. Treat a time-out as a tracking event and check the scan record for the final state.

How long does an on-demand rescan take?

Track the Scans list, which shows the state of each child scan. An estimate from an earlier run may not match the current request, so work from the states as they stand.

Does an on-demand rescan replace the scheduled Qualys runs?

No. A rescan is a request you make between scheduled cycles. The scheduled runs continue, and the states that follow a scan still arrive through the import. Keep the scheduled cycle in your remediation plan even when your team rescans often.

What belongs in a handoff note to a remediation owner?

Keep it short and factual. Include the VSCAN number, the option profile, the number of items the scan covered, any failed child scans and the date you expect the next import to run. Leave out your guess about the outcome, since the record will show the result once the import has run and the owner can check it then.