OBLYTECH Logo
OBLYTECH Logo

Add threat intelligence to a TAXII collection automatically

You can add threat intelligence to a TAXII server collection automatically with the Automatically add threat intelligence to a TAXII collection flow in Threat Intelligence Security Center. The flow starts when an observable is created or updated and meets its conditions, then adds the record to the TAXII server collections set in the selected template.

A TAXII server groups shared threat indicators into collections, and partners or internal tools poll those collections for new content. Copying qualifying observables into a collection by hand is slow and easy to skip. The automated flow handles that step inside the platform, so the collection tracks the observables your team has already scored. If the terms observable and TISC are new to you, start with the plain-language guide to ServiceNow threat intelligence before you work through the setup.

Where the flow lives and who can change it

Go to All > Threat Intelligence Security Center > Administration, then select Automated Flows. Select the action link named Automatically add threat intelligence to a TAXII collection. The rule details open in the flow designer, where you can review the trigger and each action the flow runs.

Two roles matter here. System Administrator has view, create and edit access, and sn_sec_tisc.admin has view access. A user who holds sn_sec_tisc.admin can open the rule and read its conditions, but System Administrator is the only role listed with edit access, so plan edits under that role. Who approves those edits is a separate question, and the roles, responsibilities and RACI guide helps you settle it before anyone opens the designer.

Release matters here. The Brazil version of this page was updated September 10, 2026, while the Australia, Zurich and Yokohama versions were updated March 12, 2026. Check the flow designer on your own instance before you copy any value into a change request.

Trigger conditions that decide what reaches the collection

The flow runs on the trigger Observable Created or Updated. A record moves on to the add actions only when it matches the conditions below. The type conditions are joined by or, and the other three conditions are joined by and.

  • Type is IP address (V4), or Type is IP address (V6), or Type is Domain Name
  • TISC Tags contains Add to: Sample Collection
  • Reputation is Malicious
  • Threat Score greater than or is 60

Observable type

The type condition names three values: IP address (V4), IP address (V6) and Domain Name. An observable of any other type does not match the trigger, whatever its tags or score. If your team wants other indicator types shared, that requires a change to the rule, tested the same way as any other change.

Tag and reputation

The tag value Add to: Sample Collection is the sharing signal in this rule. Agree on who applies it and when, because an observable without the tag will not reach the collection, even one that scores well. The reputation condition requires the value Malicious. An observable with any other reputation value does not pass, however high its threat score.

Threat score threshold

The threshold in the rule is 60. It is the one numeric condition in the rule, so it is the condition most likely to need tuning against how your team scores observables. Write down why you kept that value. A later review can then see the reasoning behind what the collection contains.

What the flow does with a matching observable

The flow includes two add actions, Add Record to TAXII Server Collection and Add Records to TAXII Server Collection. Both add the record provided in the inputs to the TAXII server collections configured in the selected template. The flow then reaches its end step, End the flow for adding threat intelligence to a TAXII collection.

The destination is set in the template, not in the trigger conditions. Changing a template therefore changes where matching records go, even when the trigger stays the same. Check the template before you activate the flow, and check it again whenever someone edits the template, since that edit can redirect records without touching the rule. Record which template the rule uses in the change record, so a later review can trace where matching records were sent.

Checks to complete before you rely on the flow

Run these checks on a non-production instance before the flow writes to a shared collection.

  1. Open the rule in the flow designer and compare each trigger condition with the sharing rule your team wrote down.
  2. Confirm that the selected template points to the TAXII server collections you expect and to no others.
  3. Confirm with the team that consumes each collection that it expects IP address and domain name records.
  4. Apply the tag Add to: Sample Collection to a test IP address observable with a reputation of Malicious and a threat score of 60 or higher, then confirm the record reaches the collection.
  5. Repeat step four with a test domain name observable, so both sides of the type condition get a real test.
  6. Record the names of the people who may edit the flow and the people who review what the collection receives.

For help planning this work, see ServiceNow implementation.

Testing and troubleshooting the flow

If a test record does not arrive, work backward through the four trigger conditions in the order they appear: type, tag, reputation, then threat score. A missing tag or a reputation value that differs from what the team expected typically keeps a record out, so check those two things before you open the collection.

The trigger also fires on update. An observable that crosses the score threshold after an update can be sent, even though it did not qualify when it was created. Confirm that this matches the sharing behavior your team wants. If observables are re-scored often, decide in advance how repeated updates should appear in the collection, and check that on your own instance before go-live.

Keep a short test log with the observable used, its tag, reputation and score, the time of the test, and whether the record appeared in the collection. The log gives you a repeatable check for the next change to the rule. Store it alongside the change record so a reviewer can see what was tested, when, and with which values.

Change control for the sharing rule

Edits to the trigger conditions or the selected template change what leaves your instance, so handle them as changes rather than quick fixes. The steps below keep each change traceable.

  1. Write down the proposed change, the condition or template it touches, and the reason for it.
  2. Test the change on a non-production instance with one observable for each affected condition.
  3. Log the before and after values in the test record.
  4. Get sign-off from the owner named in your RACI before the change goes to production.
  5. After activation, confirm the production collection receives only the records you intended. Keep test observables off production, because any consumer of the collection will receive them.

Planning the flow alongside related ServiceNow tasks

This flow sits in a chain of threat intelligence work. The related tasks include Automated IOC Enrichment, Automated sharing of high-risk IOCs with trusted partners, Analyze and assess threat IoCs, and Analyze, assess, and disseminate observables. The flow reads reputation and threat score, so confirm that your enrichment and assessment steps populate those fields before you rely on the flow.

For the order of the wider rollout, the implementation roadmap sets out a sequence to follow. Teams that move quickly into automated sharing typically hit setup errors that are cheaper to avoid early, so read the common mistakes guide before go-live.

Questions about the TAXII collection automation flow

Can I use a tag other than Add to: Sample Collection?

The rule checks for that tag value, so another tag does not match until the condition changes. Make that change on a test instance first, then run the checks again, because the tag decides what gets shared.

Which observable types stay out of this flow?

Any type other than IP address (V4), IP address (V6) or Domain Name falls outside the type condition, so this trigger does not match it. File hashes and URLs are examples. If your team needs those types shared, plan a separate change and test it the same way.

Who should own the threat score threshold?

Assign one named owner to sign off on the value of 60 and to keep the reason in the test log. That person should also review the threshold when the scoring process changes, since the threshold depends on the scores it is compared against.

What should each team confirm before the flow goes live?

Teams that apply the tag should know which collection their observables reach and what the threshold excludes, so no one expects a record to share that the rule will not pass.