OBLYTECH Logo
OBLYTECH Logo

Create a recurring remediation effort in the Vulnerability Manager Workspace

You can create a recurring remediation effort from a watch topic in the Vulnerability Manager Workspace. Open the watch topic, choose Create Recurring Effort, complete the three steps for details, task grouping and schedule, and save. The first effort does not show up when you save; it appears after the scheduled job creates it.

Confirm the role and watch topic before you start

The role you need depends on the type of vulnerable item the watch topic tracks. Check the matching role below before you open the form, because the role list differs by item type.

  • Host vulnerable items (VITs): sn_vul.vulnerability_analyst or sn_vul.vulnerability_admin
  • Application vulnerable items (AVITs): sn_vul.app_sec_manager
  • Container vulnerable items (CVITs): sn_vul_container.vulnerability_analyst or sn_vul_container.vulnerability_admin
  • Configuration test results (CTRs): sn_vulc.admin

A watch topic holds one recurring effort at a time, so plan how you divide your items across watch topics before you schedule anything. If your watch topic tracks configuration test results, read the configuration compliance remediation page alongside this one. For the layout of the workspace itself, start with the Vulnerability Manager Workspace overview.

Creating the recurring effort, step by step

Use this sequence the first time you schedule an effort, then repeat it for each watch topic that needs a recurring cycle.

  1. Go to All > Vulnerability Response > Vulnerability Manager Workspace > Watch Topics.
  2. Select the watch topic you want to schedule.
  3. In the upper right of the watch topic, open the Create Remediation Effort list and select Create Recurring Effort. The Create Recurring Effort modal opens.
  4. Complete step 1, Effort details, and select Next.
  5. Complete step 2, Task generation, and select Next.
  6. Complete step 3, Recurrence, and select Schedule recurrence.

Effort details

Enter a short description that lets you find the effort in the effort list at a glance. Use the Description field for the context a colleague would need, such as the exposure or asset group the effort covers. A specific description pays off later, when several recurring efforts sit side by side in the list and you need to tell a monthly external-facing cycle from a quarterly internal one.

Choosing how vulnerable items group into tasks

Step 2 decides how the items in each generated effort are bundled into remediation tasks. You choose one of four methods:

  • By Assignment group
  • By Assignment group and configuration item
  • By Assignment group and vulnerability
  • None (No remediation tasks are created)

Choose None when you want the effort without automatic tasks. You can then add records to a remediation task by hand, or create a remediation task on demand from the effort. This suits a team that triages each item individually rather than in bundles.

The option to automatically refresh duplicate vulnerable items appears only for host vulnerabilities. Select it when duplicate host items should refresh in the remediation tasks the effort generates. The option does not apply to application, container or configuration items.

Application vulnerable items (AVITs) also have their own exception handling in Application Vulnerability Response. Read the application vulnerability response rules and exceptions page before you settle on a grouping for AVITs.

Setting the recurrence schedule

Step 3 sets how often the effort is created and the clock time it is created. Choose one frequency:

  • Quarterly (Every 3 months), which creates the effort once every three months
  • Monthly, which creates the effort once in each month
  • Weekly, which creates the effort once in each week
  • Daily, which creates the effort once each day

The weekly and daily frequencies appear from version 19.0 of Vulnerability Response onward. Check the list on your instance and release before you plan a daily cadence.

Setting the date and time

Use the lists to choose the month, day, hour and minute the effort is created. The time zone defaults to your own time zone, so confirm it before you save when the team that works the effort sits in another region.

When the watch topic holds a large number of vulnerabilities, set the creation for off-hours.

For a month-end schedule, the job creates the effort on the last day of the month. The form also shows a message when the month you pick does not have 31 days, so read it before you save.

Carrying open items forward

Select the option to carry over vulnerabilities to active vulnerabilities in this remediation effort when items that are still active should move into each later effort the schedule creates. Compare the first two efforts with what you expected before you rely on the setting, because a carried list typically grows when items are not closed in each cycle.

When the schedule is set, select Schedule recurrence. The form confirms that the recurring remediation record was created.

Planning cadence across several watch topics

Choose the interval by looking at how long your team takes to close one cycle. If a cycle regularly runs past the next creation date, a short interval stacks efforts on top of each other and the list gets hard to read. Map each watch topic to one cadence, and record the owner next to it so the schedule stays with someone who can change it.

Several watch topics on different cadences add up quickly to a schedule that is hard to track. For help planning this work, see ServiceNow implementation.

Checks after the schedule is saved

Right after you save, open the watch topic and check the next creation date shown there. Confirm that the date and clock time match the schedule you entered, including the time zone.

Transfers have one limit to plan around. Records cannot move from a recurring remediation effort into a new remediation effort, though records can move from an existing, non-recurring remediation effort into a new one. Plan your handling of items with that limit in mind.

How activation status affects the schedule

Scheduling depends on the watch topic being active. Starting with version 18.0, the Create Recurring Effort option is inactive on an inactive watch topic, so you cannot schedule a new recurring effort there. If you deactivate a watch topic that already has a scheduled effort, no new effort is created until you activate the topic again. While the topic is inactive, the effort recurrence and next recurrence date details also disappear from the upper right of the watch topic. After you reactivate it, the effort is created at the upcoming scheduled time.

Troubleshooting a schedule that produces no efforts

Work through these checks in order. Change one setting at a time so you can tell which change made the difference.

  1. Confirm the watch topic is active. An inactive topic blocks new scheduling and pauses creation for an existing schedule.
  2. Confirm your user holds the role for the item type the watch topic tracks.
  3. Check the time zone in the Recurrence step against the time zone your team works in.
  4. Open the watch topic and compare the next creation date shown there with the date you scheduled.
  5. After the scheduled time has passed, check the effort lists again. An effort that has not appeared yet may still be waiting for the job to run.

Reviewing the first generated effort

The first effort from a new schedule is the best test of your setup, so review it before you rely on the cycle. Open the effort and read the short description and description, which should still make sense in a list next to other efforts. Then check the remediation tasks it generates against the grouping you chose. Each task should hold items that belong together under the method you selected, and duplicate host items refresh when you selected that option.

Look at the items the effort carries forward as well. If you turned on carry-over, confirm the listed items are ones that should still be open. If an item should have closed in an earlier cycle, fix the owner’s review step before the next effort is created, not after.

Questions about recurring effort setup and cadence

Which grouping method suits a watch topic owned by one assignment group?

When one assignment group owns the whole watch topic, grouping by assignment group alone keeps the task list short and easy to scan. Add the configuration item to the grouping when that group owns many configuration items, because the bundles then split into smaller pieces that are easier to assign and close.

How do I choose between a monthly and a quarterly cadence?

Start from the length of your remediation windows. A quarterly rhythm suits long remediation windows and changes that need planning. A monthly rhythm fits teams that clear items within a few weeks and want exposure reviewed more often.

Should open items carry forward into each new cycle?

Carry them forward when an item stays open for a reason that outlasts one cycle, such as a vendor fix that has not shipped yet. Stop carrying them when the same items keep reappearing, because a list that keeps growing usually points to a cycle that is too short or an owner who is not reviewing it.

Is a recurring effort the right tool for a one-time fix?

Usually not. A recurring effort suits exposure that returns on a schedule, such as a monthly review of external-facing findings. For a single fix window with a fixed end date, a standard remediation effort keeps the record simpler and avoids a series of efforts you would have to close one by one.